Laserfiche WebLink
AQUIW <br />SAN .IOAGlU1N COUNTY <br />y I ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: wtrt/w.sigov.orq/ehd <br />\ iFi05 <br />UNDERGROUND STORAGE TANK (UST) PROORANI SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />K <br />Inspection Date: <br />6 <br />Facility Address: <br />BEWce\Ucillxl(2, Lo -t,12 <br />Service Request #: <br />a 0 3�i 5 <br />❑ mechanical Model: <br />Onsite Service Technician's Name: <br />ICC Service Technician/installer Exp. Date: <br />Manufacturer Training: <br />❑ <br />Leak detector <br />❑ <br />SERVICE <br />,A , -r tS .I l` • <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />IBM# <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />•- • • • <br />❑ NA <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />❑ This UST facility is APPROVED to operate <br />a I Or 1-n an P n tnlll.� <br />SERVICE <br />,A , -r tS .I l` • <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />IBM# <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) V4IR I e9h Piping <br />Sump(s) UST(s) <br />•- • • • <br />T sting for the above components are next due by: <br />0 <br />O V) 5 w• <br />Note: Please be aware that 2° containment components are 4quired to be tested upon <br />installation. 6 months after, and every 36 months thereafter. <br />❑ <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />IM -1.n 0 '' % D -O <br />,A , -r tS .I l` • <br />IBM# <br />Kill, <br />=IWAAR <br />•- • • • <br />_. <br />I AIR ��m�Vkvso- <br />0 <br />EHD 23-04 \)CLa:) <br />I C 0 � �/ UST SERVICE REQUEST INSPECTION REPORT <br />Rev 4/30/12 <br />