Laserfiche WebLink
SWRCB , January 2002 Page of <br /> 8 . UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By : ❑ UDC Manufacturer ❑ Industry Standard X Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used : ❑ Pressure ❑ Vacuum X Hydrostatic <br /> ❑ Other (Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: . 002 <br /> UDC # 9& 10 UDC # UDC # UDC # <br /> UDC Manufacturer: Total Containment <br /> UDC Material : Poly Plastic <br /> UDC Depth : 32" <br /> Height from UDC Bottom to Top 12" Product <br /> of Highest Piping Penetration : <br /> Height from UDC Bottom to 15 " <br /> Lowest Electrical Penetration : <br /> Condition of UDC prior to Dry <br /> testing : <br /> Portion of UDC Tested' Water Line 19" <br /> Does turbine shut down when <br /> UDC sensor detects liquid (both Yes <br /> product and water)? ` <br /> Turbine shutdown response time Not Alarmed <br /> Is system programmed for fail- <br /> safe shutdown? ' Yes <br /> Was fail-safe verified to be No <br /> operational?' <br /> Wait time between applying 5 Minutes <br /> water and starting test <br /> Test Start Time : _ 8 : 52 <br /> Initial Reading (RI) : . 001 <br /> Test End Time : 9 :22 <br /> Final Reading (RF) : . 001 <br /> Test Duration : 30 Minutes <br /> Change in Reading (RF-Ri) : 0 <br /> Pass/Fail Threshold or Criteria: . 005/30 Minutes <br /> Test Result: Pass <br /> Was sensor removed for testing? Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? Yes <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to as of the questions indicated with an <br /> asterisk ( *) is "NO" or "NA", the entire UDC must be tested . (See SWRC13 LG - 160) <br />