Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: JIMCO TRUCK STOP 1022 FRONTAGE ROAD RIPON CA <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 12s Iz/ <br /> IIs � � Ili � � 10/9 � ��s• S/7s � 7/6s 6/5 4/3 <br /> . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . <br /> STORE <br /> O <br /> O . . . . . . . . . . . . . . x <br /> O <br /> . . . . . . . . . CAS @ <br /> . . . . . . . . . . . . . . . . . . I . . . . . . . <br /> . <br /> KEY <br /> A=ANNULAR 0 <br /> F=FILLS <br /> T=TURBINE <br /> P=PROBE O <br /> V=VAPOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> X=SUMP SENSOR . . . . . . O <br /> L=LD . . . . . . <br /> M=Manway . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> B=Brine Sensor . . I . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> I=Smart Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> S=STP . . . . . . . . . . . . <br /> C=Floats&Chains . . . . . . . . . . <br /> E—EStoP . . . . . . . <br /> Date map was drawn:3/6/17 <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes('If used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />