Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: GEMCO RIPON TRUCK PLAZA Date of Testing: 2/20/18 <br /> Facility Address: 1022 S FRONTAGE RD RIPON,CA 95366 <br /> Facility Contact: GURPREET Phone: <br /> Date Local Agency Was Notified of Testing: 1/25/18 <br /> Name of Local Agency Inspector({fpresenl during testing): <br /> 2.TESTING CONTRACTOR INFORMATION <br /> Company Name: AFFORDA TEST 416 2" Street Galt,CA 95632 (209)744-0112 Fax: (209)744-0116 <br /> Technician: ®Ed Stearns ❑ Zane A.Nimmo ❑ David A.Winkler ❑ Felix G.Ramirez <br /> 8883080-UT 8883064-UT 8883059-UT 5273934-UT <br /> Credentials': ® ICC Service Tech. ® SWRCB Tank Tester <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ® Hydrostatic ❑ Vacuum ❑ Other <br /> Test Equipment Used: TAPE MEASURE Equipment Resolution: 1/16 <br /> Identify Spill Bucket (ki Tank 1 87 2 91 3 4 <br /> �Vitnaber, Stored Product, etc.) <br /> ® Direct Bury ®Direct Bury ❑ Direct Bury ❑Direct Bury <br /> Bucket Installation Type: El Contained in El Contained in <br /> ❑ Contained in Sump ❑Contained in Sump Sum Sum <br /> Bucket Diameter: I I I I <br /> Bucket Depth: I 14 <br /> Wait time between applying _ <br /> vacuum/water and start of test: <br /> Test Start Time(Ti): 0900 0900 <br /> Initial Reading(Ri): 12 13 <br /> Test End Time(TF): 1000 1000 <br /> Final Reading(RF): 12 13 <br /> Test Duration(TF—Ti): IHR IHR <br /> Change in Reading(RF-Ri): 0 0 <br /> Pass/Fail Threshold or 1/16 1/16 <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Cont tuents— (include information on repairs made prior•to testing, and recorrunetrcled follotiv-zip for failed tests) <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature] 6i( Date:2/20/18 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />