Laserfiche WebLink
STI-P3 CORROSION MONITORING STATION <br /> (TERMINATE ANODE CABLES IN BOX) <br /> NOTES: <br /> 1. Additional anodes for future <br /> 1 , use. Do not connect anode <br /> / cables to monitoring terminals. <br /> � 2. Provide the following additional <br /> r anodes at each tank: <br /> / — TANK 230 W. Elm Street <br /> 2,000 gal . tank - 2 anodes <br /> 12,000 gal . tank - 5 anodes <br /> � <br /> 3312S000alamantank - 2 anodes ea. <br /> 9 <br /> 5,000 gal . tank - 4 anodes <br /> -- ! 10,000 gal . tank - 6 anodes <br /> INSTALL 2x2x60" -20# PREPACKED MAGNESIUM ANODE <br /> (INSTALL ANODE VERTICAL OR HORIZONTAL) <br /> WITH 5-GALLONS WATER BEFORE BACKFILLING <br /> WITH NATIVE SOIL ONLY <br /> V " <br /> m <br /> _b <br /> ?G <br /> TYPICAL ANODE INSTALLATION <br />