My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
230
>
2300 - Underground Storage Tank Program
>
PR0231330
>
INSTALL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 8:55:32 AM
Creation date
7/23/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231330
PE
2361
FACILITY_ID
FA0003964
FACILITY_NAME
LODI PUBLIC SAFETY BUILDING
STREET_NUMBER
230
Direction
W
STREET_NAME
ELM
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303109
CURRENT_STATUS
02
SITE_LOCATION
230 W ELM ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
does not comply with the Engineer's request for 5.506 Temporary Suspension of Work The City <br /> correction within a reasonable time as determined by Engineer shall ave the aut ority to suspend the <br /> the Engineer, the City may, notwithstanding the work wholly or in part, for such period as City <br /> provisions of this section, proceed to make such Engineer may deem necessary, due to unsuitable <br /> correction or provide such attention and the costs weather or to such other conditions as are <br /> Ui such correction or attention shall be charged considered unfavorable for the suitable prosecution <br /> against the Contractor. Such action by the City of the work, or for such time as City Engineer may <br /> will riot relieve the Contractor of the guarantees deem necessary, due to the failure on the part of <br /> provided in this section or elsewhere in this the Contractor to carry out orders given, or to <br /> contract. perform any provisions of the contract. The <br /> Contractor shall immediately obey such order of the <br /> This section does not in any way limit the guarantee City Engineer and shall not resume the work until <br /> on any items for which longer guarantee is specified ordered in writing by the City Engineer. <br /> nor on any items for which a manufacturer gives d <br /> guarantee for a longer period, nor does it limit In the event that suspension of work is ordered as <br /> other remedies of the City in respect to latent provided above, and should such suspension be <br /> defects, fraud or implied warranties. ordered by reason of the failure of the Contractor <br /> to carry out orders or to perform any provision of <br /> 5.416�Cooperation Should construction be the contract; or by reason of weather conditions <br /> underway by otFer agencies or by other contractors being unsuitable for performing any item or items of <br /> within or adjacent to the limits for the work work which, in the sole opinion of the Engineer, <br /> specified, or should work of any other nature be could have been performed prior to the occurrence of <br /> underway by other forces within or adjacent to said such unsuitable weather conditions had the <br /> limits, the Contractor shall schedule and coordinate Contractor diligently prosecuted the work when <br /> the work with the other contractors and agencies so weather conditions were suitable; the Contractor, at <br /> there is the least amount of conflict during all Contractor's expense, shall do all the work <br /> phases of construction. The Contractor is also necessary to provide a safe, smooth and unobstructed <br /> responsible for making all necessary agreements with passageway through construction for use by public <br /> other contractors as required during construction. traffic during the period of such suspension as <br /> provided in Section 7-1.08, "Public Convenience," <br /> 5.500 PROSECUTION AND PROGRESS and 7-1.09, "Public Safety," of the Standard <br /> Specifications, and as provided in the Contract <br /> 5.501 Subcontracting The Contractor shall give Specifications. In the event that the Contractor <br /> personal attentioo the fulfillment of the fails to perform the work above specified, the City <br /> contract and shall keep the work under control. may perform such work and the cost thereof will be <br /> deducted from moneys due or to become due the <br /> Subcontractor will not be recognized as such and all Contractor. <br /> persons engaged in the work of construction will be <br /> considered as employees of the Contractor, and their 5.507 Time of CComPletion and Liquidated <br /> work shall be subject to the provisions of theami ages It is agreedy the the Contractor that <br /> contract and specifications. in case all the work called for under the <br /> contract is not completed before or upon the <br /> Where a portion of the work subcontracted by the expiration of the time limit as set forth in <br /> Contractor is not being prosecuted in a manner the contract, damage will be sustained by the <br /> satisfactory to the City Engineer, the subcontractor City of Lodi, and that it is and will be <br /> shall be removed immediately on the requisition of impracticable to determine the actual damage <br /> the City Engineer and shall not again be employed on which the City will sustain in the event of and <br /> the work. by reason of such delay; and it is therefore <br /> agreed that the Contractor will pay to the City <br /> 5.502 Assignment The performance of the contract of Lodi the sum as specified in Section 6-04.03 <br /> may not 6e assigned, except upon written consent of "Beginning of Work, Time of Completion and <br /> the City. Consent will not be given to any proposed Liquidated Damages"per day for each and every <br /> assignment which would relieve the original day's delay beyond the time prescribed to <br /> Contractor or Contractor's surety of their complete the work; and the Contractor agrees to <br /> respunsibi1ities under the contract, nor will the pay such liquidated damages as herein provided, <br /> City consent to any assignment of a part of the work and in case the same are not paid, agrees that <br /> under the contract. the City of Lodi may deduct the amount thereof <br /> from any moneys due or that may become due the <br /> 5.503 (deleted) Contractor under the cnntract. <br /> 5.504 (deleted) It is further agreed that in case the work called <br /> for under the contract is not finished and completed <br /> in all parts and requirements within the time <br /> 5.505 Character of Work Personnel If any specified, the City Council shall have the right to <br /> subcontractor or person employed by the Contractor extend the time for completion or not, as may seem <br /> fails or refuses to carry out the directions of the best to serve the interest of the City; and if it <br /> City Engineer or appears to the City Engineer to be <br /> incompetent or to act in a disorderly or improper <br /> manner, that person shall be discharged immediately <br /> on the requisition of the City Engineer, and such <br /> person shall not again be employed on the work. <br /> 5.6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.