My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_1988
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELM
>
230
>
2300 - Underground Storage Tank Program
>
PR0231330
>
INSTALL_1988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2020 8:55:32 AM
Creation date
7/23/2020 12:02:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1988
RECORD_ID
PR0231330
PE
2361
FACILITY_ID
FA0003964
FACILITY_NAME
LODI PUBLIC SAFETY BUILDING
STREET_NUMBER
230
Direction
W
STREET_NAME
ELM
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303109
CURRENT_STATUS
02
SITE_LOCATION
230 W ELM ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
103
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 7 of 13 <br /> C. POST-INSTATrA'T'rON PRESSURE TEST, AIR: Procedures for the pre-installation pressure <br /> test shall be repeated. This test may be performed with or without piping and <br /> fittings attached. The secondary (outer) tank test must be performed a minimum of <br /> 1/2 hour and all fittings shall be soaped. <br />} D. PRIMING: Manway lids shall be primed with Polyken 927. <br /> E. BURIAL DEPTH: The burial depth from the top of the tank to ground level shall be a <br /> miniMUm of 4 feet and a maximum of 7 feet. The fittings in the m anway are <br /> approximately 5-6 inches off the top of the tank. This shall be considered for the <br /> slope of the piping and thus may affect the tank burial depth. <br /> F. NONITORING: <br /> 1. Monitoring of the annular space is to be performed by an electronic system. <br /> One inch conduit shall be run from each monitoring riser to the main control <br /> panel. <br /> 2. Contractor shall install and test tank sacrificial anodes per manufacturer's <br /> instructions and recommendations. <br /> 6-150.10 PRODUCT VENT AND VAPOR RECOVERY PIPING <br /> A. All piping, fittings, risers, wrapping materials, etc. , shall be furnished and <br /> installed by the Contractor. Specific materials noted in this specification and/or <br /> on plans will be furnished by Owner, hereinafter referred to as Ccupany. <br /> 1. All pipe runs are to be of "fiberglass" pipe and sized in accordance with <br /> plans. <br /> 2. Galvanized steel pipe and fittings are to be used only for tank riser pipes, <br /> risers to emergency shut-off valves, and swing joints at vent risers. Above <br /> ground vent risers shall be steel pipe. <br /> 3. Do not use galvanized pipe and fittings with diesel fuel. Use black iron pipe <br /> and fittings. <br /> FIBEFraLASS PIPE: Pipe and fittings to UL <br /> c, for underground <br /> Piping of petroleum product. The. pipe is to have bell and spigots joints. <br /> Approved Fiberglass Pipe: <br /> A.O. Smith Inland Inc. <br /> Red Thread II Pipe System <br /> 1. Non-metallic fittings are to be those manufactured by the supplier of the pipe <br /> being used. <br /> 2. Install pipe and fittings in accordance with manufacturer's instructions. <br /> C. STEEL PIPE: (Galvanized or Black Iron) <br /> Schedule 40 (ASTM A-120) Steel Pipe <br /> 250# Railroad Unions <br /> 150# Malleable Iron Fittings <br /> 1. Do not use standard couplings normally Burnished with the pipe. <br /> 6. 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.