My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
14971
>
2300 - Underground Storage Tank Program
>
PR0231911
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:21:33 AM
Creation date
7/23/2020 1:06:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0231911
PE
2361
FACILITY_ID
FA0000540
FACILITY_NAME
COUNTRYSIDE LIQUORS & GAS
STREET_NUMBER
14971
Direction
N
STREET_NAME
STATE ROUTE 88
City
LODI
Zip
95240
APN
06316025
CURRENT_STATUS
01
SITE_LOCATION
14971 N HWY 88
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EMED Model A1100 Overfill <br /> WHEATON RETAIL Prevention Valve OPV <br /> Flapper Valve Primary Float <br /> Step 4: Slowly insert the Model A0081- Figure 3: Hook end secured to the Figure 4: Close-up <br /> 1101 test tool from the bottom of the underside of the flapper valve. <br /> lower tube until the hook end secures to <br /> the underside of the flapper valve. <br /> Refer to Figures 3 and 4 for details. <br /> Testina the Primary Float and Flapper Valve: <br /> MEL <br /> ;jyaai Figure 5: Primary float, down- <br /> ward position. <br /> Step 5: With the flapper valve latched Step 6: Using a scribe move the pri- <br /> open, and the hook end secured,gently mary float upward to unlatch the flapper <br /> tug on the test tool, the flapper valve valve, and with the hook end secured, <br /> must remain open. gently tug on the test tool, the flapper <br /> valve must close,the test tool will move <br /> about 3" downward. Refer to Figures Figure 6: Primary float, upward <br /> 5, 6, 7 and 8 for details. position. <br /> Figure 7: Primary float upward, flapper Figure 8: Primary float upward, flapper Step 7: Using the scribe move the pri- <br /> valve unlatched and closing. valve unlatched and closed. mary float downward. <br /> IMPORTANT: Perform steps 6 Step 10: Re-install the fill adapter, cap <br /> through 8 a minimum of three times and spill container lid on the tank fill <br /> to assure the primary float, latch and riser. <br /> flapper valve components of the <br /> Model Al 100 OPV are operating prop- <br /> erly. <br /> R'` Step 9: Lift the Model All 00 OPV with <br /> the collar upward and re-install on the 2300 Industrial Park Dr.-Wilson,NC 27893 <br /> Step 8: With the hook end secured, tank fill riser. Replace the drop tube <br /> gently allow the flapper valve to move o-ring art number 569461 if damaged 252-243-0150•252-ail.co 59(fax) <br /> 9 P 9 www.emcoretail.com <br /> upward and spring back into an open or missing. ©2018 Emco Wheaton Retail Corporation <br /> position, tug gently on the test tool, the <br /> flapper valve must relatch and remain 08-11100 <br /> ____ 2 08/18, Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.