Laserfiche WebLink
Dynamic Back Pressure Test <br /> Allorda-TeSt 416 2nd Street TP 201.4 <br /> Galt, Ca. 95632 <br /> (209)744-0112(800)524-9087 FAX(209)744-0116 Static Pressure Decay Test <br /> TP 201.3 <br /> Owner/Contractor/Eng:RUPI TEST DATE: 8-24-18 TIME: UST ® AST ❑ <br /> TECHNICIAN NAME: <br /> SITE NAME: GEORGE'S MINI MART ❑ PT ❑ Startup"fest ® Compliance Test <br /> DAVE WINKLER <br /> Address: 18662 N. HWY 88 <br /> City:LOCKEFORD,CA 95237 I declare, under penalty of perjury under the laws of the state Inspector: <br /> of California that based on information and belief formed <br /> Phone: after reasonable inquiry, the statements and information <br /> Contact: <br /> provided in the document are true,accurate,and complete. Present ❑ Not Present® ' <br /> 2 h M8 <br /> Confirmation <br /> TECH SIGNATURE. <br /> Permit or Facility#N-3466-1-2 ENVIRONMENI L HEALTH <br /> PART ENT <br /> #DISPENSERS 4 DISPENSER Make: GILBARCO NOZZLE Make: HELY PV Valve Make:HUSKY <br /> #TOTAL NOZZLES 8 Model: Model:900 Model:5885 <br /> .kIANIFOLDED: Yes ® No❑ BALANCE ❑ ASSIST® Assist Type:VR 202 <br /> Tank 1 Tank 2 Tank 3 Tank 4 TOTAL <br /> Fuel Grade 87 89 91 ALL Initial pressure before testing-.:3.14 'we <br /> #Nozzles per Tank 8 -- -- 8 EQUIPMENT <br /> Actual Tank Capacity 10,175 4,077 6,082 20,334 Deem- Blockage: <br /> Gasoline Volume 5662 2902 1566 10130 <br /> Incline Manometer ❑ Incline Manometer ❑ <br /> Ullage(capacity minus Volume) 4513 3180 4516 12209 Magnehelic Guage ❑ Magnehelic Guage <br /> Phase I System Type:2pt EVR Coaxial 0 P V• EVR Digital Manometer ® I Digital Manometer ❑ <br /> Initial Test Pressure(Inches water)2t0 2,00 Equipment Calibration Date: 7-9-18 <br /> 2.02 Drift Check End Value: .00 <br /> PSI 1 Minute(taches Water) Nitrogen Intro.Point: 87 VA <br /> PSI @ 2 Minutes 2,00 <br /> PSI @ 3 Minutes 2,00 <br /> Allowable Fill Time 2 sefm 4:00 <br /> PSI @ 4 Minutes 1.99 Time 1: 1:42 <br /> Final Pressure @ 5 Minutes(Inches water) 1.99 Time 2• <br /> Allowable Final Pressure CARB 1.85 Time 3: <br /> Liquid Removal Check,Dynamic Back <br /> ------- Pressure(if due),and Parts& <br /> ------- ------- ------- PASS Repairs Are Listed on Pa a 2. <br />