Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
APPENDIX E <br />INSTALLIN6TANKS (See sections 5 and 7) <br />Record tank diameter measurement #1 (before ur,Lrll rti r!rl <br />Record final backfill bedding depth under tank inches or centimeters <br />Record final tank spacmq between tanks inches or centimeters <br />Record final lank spacing from tank endcap to excavation walls - <br />inches or centimeters <br />If applicable deadmen used -factory supplied or other <br />If applicable, anchoring hardware -factory -supplied or other <br />Record diameter measurement #2 (after straps are installed) <br />Subtract diameter measurement #2 from #1 and record <br />Deflection measurement meets Table 1-6 requirements -yes or no <br />TANK 11 <br />TANK #2 g TANK #yF� TANK 94 <br />I lL <br />12 3/4 <br />---- ------ <br />Postinstallation tests were conducted for pressure -testable tanks- <br />yes ornoI¢5 <br />yL� <br />`i L" <br />q <br />2 <br />` �1 51J pIPf�e� <br />FAC-h()l5Vpfl,eIII <br />t -Wk, 'r t 2� 1/1, l. L 3 3�4 <br />i/4„ I'y, <br />J <br />Voids under tank between ribs and under domes filled with backfill <br />and tamped -yes or no - --- - - _ Iles <br />Backfill placement and compaction meet requirements -yes or no <br />Piping connections meet requirements -yes or no eS <br />Fittings and other metal components are coated for corrosion <br />protection - yes or no Y e S <br />Record diameter measurement #3 (after backfilling to top of tank is <br />complete) <br />Subtract diameter measurement #3 from 0 and record <br />Deflection measurement meets Table 1.6 requirements -yes or no <br />Tank was ballasted priorto bringing backfill to top of tank -yes or no <br />After backfilling is brought to top of tank (See sections 5,6 and 8) <br />S \es <br />�S <br />yzs ��s <br />Tank was ballasted after bringing backfill to top of tank -yes or no <br />12, <br />f Z 3 3/y „ <br />N <br />---- ------ <br />Postinstallation tests were conducted for pressure -testable tanks- <br />yes ornoI¢5 <br />�J a <br />N C <br />1,30 <br />Tank was ballasted after bringing backfill to top of tank -yes or no <br />_ o <br />---4-- <br />jJ o <br />ieS <br />N <br />---- ------ <br />Postinstallation tests were conducted for pressure -testable tanks- <br />yes ornoI¢5 <br />If applicable, optional hydrostatic test was performed -yes or no <br />If applicable, containment sump test was successful -yes or no4, <br />'r <br />I f backfill over tank -give in inches or centimeters <br />Record final depth o bac g _ <br />� 2 <br />_1 <br />3,/y <br />13 I L <br />Record diameter measurement #4 (after backfilling is brought to <br />subgrade) <br />Subract diameter measurement #4 from #1 and record <br />Final deflection measurement meets requirements of Table 1.6- <br />yes or no <br />vcc% <br />a n <br />GAC/- .4 <br />a rr <br />(� <br />r r <br />If applicable, type of surface pad used -concrete or asphalt _ <br />If applicable, thickness of surface pad used -give in inches or <br />centimeters and note which type <br />If applicable, record monitoring fluid level when backfilling & top slab <br />« <br />�� <br />installation are complete <br />46 'APPENDIX E <br />ZCL I XERXES' <br />Scanned by CarnScanner <br />