Laserfiche WebLink
z <br /> HEALTH AND SAFETY PLAN <br /> 'II <br /> Due to the fact we are not proposing ''extensive re-excavation , <br /> of problem area and only re-excavating for the purpose of E <br /> recovering soil sample we feel that an extensive Health & <br /> safety plan is not required . However!; we ' do feel a basic <br /> health and safety plan be followed . <br /> The safety coordinator and project mal�iage# will be <br /> Tim Ahearn (943-1981) . He will be present on ,fob site when <br /> all work is being done . There will also be one co-worker <br /> i <br /> present who has been versed in Safety;, He will be stationed <br /> it <br /> on the West side of work area with emergency equipment which <br /> it <br /> will include a first-aid kit and one firellextinguisher . <br /> There will also be disposable TYVEK Coveralls and gloves on ' <br /> �I <br /> site if needed . <br /> Telephone numbers for emergency response assistance <br /> A. St . Joseph ' s Medical Center i. 943-2000 <br /> 1 B . All-City Ambulance 464 .4846 <br /> I� <br /> �i <br /> C. Fire Department 911 <br /> �I <br /> D. County Environmental Health 468-3420 <br /> 1 <br /> II <br /> SII <br /> 'i <br /> l <br /> II <br /> ',j I <br />