My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
1904
>
2300 - Underground Storage Tank Program
>
PR0541937
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 2:52:52 PM
Creation date
7/23/2020 2:45:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0541937
PE
2351
FACILITY_ID
FA0024059
FACILITY_NAME
ARCO AM/PM #83831*
STREET_NUMBER
1904
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1904 DANIELS ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wiring Procedure <br /> 1. Using wire nuts, connect the two-wire sensor cable to the field wires in the sensor junction box (see Figure 2). <br /> Note, the Sump Sensor wiring has no polarity. <br /> Black <br /> To <br /> �T <br /> Interstitial From <br /> Sensor Seal oft Sensor <br /> Interface i Red <br /> Module <br /> 1/2"rigid <br /> conduit <br /> Epoxy sealed connections in a <br /> weatherproof junction box <br /> Figure 2. Sensor Field Wiring Diagram <br /> 2. Do NOT terminate drain wire at this location,ground drain wire at console only. <br /> 3. Seal wire nuts with epoxy sealant following the instructions in Figure 3. <br /> 4. Push the epoxy sealed bag into the junction box. Replace and tighten the junction box cover. <br /> 5. Consult the appropriate console site prep manual to connect the Sump Sensor to the console. <br /> A B C From probe, <br /> sensor, r <br /> � tr- <br /> ransducerTo console <br /> Make sure that <br /> the ends of cablesheathing are sub-merged in sealanwrap <br /> e nuts <br /> Instructions: <br /> NOTE: When temperature is below 507 (10'C), keep 4. Mix thoroughly to a uniform color by squeezing <br /> resin in a warm place prior to mixing (e.g., in an contents back and forth 25-30 times. <br /> inside pocket next to body). 5.Squeeze mixed,warm resin into one end of bag and <br /> 1.Open epoxy sealant package,and remove resin pak. cutoff other end. <br /> 6. Slowly insert wiring connections into sealing pack <br /> 2.Holding resin pak as shown in A,bend pak along long until they fit snugly against the opposite end as <br /> length. shown in C. <br /> 3.As shown in B,firmly squeeze the RED SIDE of the 7.Twist open end of bag and use tie wrap to close it off <br /> resin, forcing it through the center seal and into and position the tie wrapped end up until the resin <br /> BLACK SIDE. jells. <br /> CAUTION:Epoxy sealant is irritating to eyes.respiratory system, <br /> Tr1 (k O and skin.Can cause allergic skin reaction.Contains:epoxy resin <br /> and Cycloaliphatic epoxycarboxylale. <br /> Precautions:Wear suitable protective clothing,gloves,eye,and <br /> face protection.Use only in well ventilated areas.Wash <br /> thoroughly before eating,drinking,or smoking. c,nyyef,ep,y2ry ep, <br /> Figure 3. Epoxy Sealing Field Connections <br /> 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.