My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DANIELS
>
1904
>
2300 - Underground Storage Tank Program
>
PR0541937
>
COMPLIANCE INFO_2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 2:52:52 PM
Creation date
7/23/2020 2:45:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2018
RECORD_ID
PR0541937
PE
2351
FACILITY_ID
FA0024059
FACILITY_NAME
ARCO AM/PM #83831*
STREET_NUMBER
1904
STREET_NAME
DANIELS
STREET_TYPE
ST
City
MANTECA
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1904 DANIELS ST
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Introduction <br /> This manual contains installation procedures for the Veeder-Root Sump Sensor (Part No. 794380-208 or 794380- <br /> 209). <br /> This manual assumes field wiring has been run from the console to the sump in which the sensor will be installed <br /> following instructions in the appropriate console's site prep manual. <br /> ! Important! Sump Sensor field wiring must not be connected to the console prior to sensor <br /> installation. <br /> Contractor Certification Requirements <br /> Veeder-Root requires the following minimum training certifications for contractors who will install and setup the <br /> equipment discussed in this manual: <br /> Installer(Level 1) Certification: Contractors holding valid Installer Certification are approved to perform wiring <br /> and conduit routing; equipment mounting; probe, sensor and carbon canister vapor polisher installation; wireless <br /> equipment installation; tank and line preparation; and line leak detector installation. <br /> ATG Technician (Level 2/3 or 4) Certification:Contractors holding valid ATG Technician Certifications are <br /> approved to perform installation checkout, startup, programming and operations training, system tests, <br /> troubleshooting and servicing for all Veeder-Root Series Tank Monitoring Systems, including Line Leak Detection. <br /> In addition, Contractors with the following sub-certification designations are approved to perform installation <br /> checkout, startup, programming, system tests, troubleshooting, service techniques and operations training on the <br /> designated system. <br /> • Wireless 2 <br /> • Tall Tank <br /> Warranty Registrations may only be submitted by selected distributors. <br /> Product Marking Information <br /> RELATED DOCUMENTS <br /> Documents Required to Install Equipment <br /> This intrinsically safe apparatus is only for use as part of a Veeder-Root Automatic Tank Gauging System (ATG <br /> Console with probes and sensors). To install intrinsically safe apparatus, use the specific control drawing that <br /> appears on the nameplate of the applicable associated apparatus (ATG Console): <br /> UL/cUL Control Drawing <br /> Equipment Document No. <br /> Associated Apparatus <br /> TLS-450/8600 331940-008 <br /> TLS-350,TLS-350R 331940-011 <br /> TLS-300 331940-013 <br /> TLS4/8601 331940-018 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.