Laserfiche WebLink
Jd <br /> J. H. KLEiNFELDER&ASSOCIATES <br /> File: W-2005-1 <br /> March 18, 1985 <br /> Page 12 <br /> o Stif - diagrams should be prepared for several samples from <br /> the monitoring wells once a major ion analyses is <br /> performed. Additional stiff diagrams of the production <br /> well and the surface impoundments should be prepared using <br /> previously collected data. Comparison of the stiff <br /> diagrams will provide information on the variation of the <br /> chemical compositions of the water samples. quality <br /> variations. <br /> o Water level elevations should be measured on a monthly <br /> basis through the winter and spring months. At this time, <br /> the wells should also be observed for floating <br /> hydrocarbons. Elevation of the water in the surface <br /> impoundment should also be determined in conjunction with <br /> the above task. <br /> ,o 'A 24-hour pump test of the shallow aquifer should be <br /> performed to gather aquifer characteristics for use in <br /> the extraction well design. <br /> U� <br /> VI1I. LINXTA'TIONS <br /> This report was prepared in general accordance with the <br /> accepted standard of care which exists in Northern California at <br /> the time the investigation was performed. It should be recognized <br /> that definition and evaluation of geologic conditions is a <br /> difficult and inexact art. Judgments leading to conc .usions <br /> and recommendations are generally made with an incomplete <br /> o _ <br />