Laserfiche WebLink
REMEDIATION SYSTEM'S OPERATION OVERVIEW <br /> Pump- and, ,.,Treat System <br /> The P&T system was turned off by ASE personnel on February 28, 2002 That <br /> system no longer operates <br /> Air-Spa_ing/Vapor-Extraction System <br /> The ASNE system operated all 31 days of the month <br /> On June 10, 2002, ASE closed VE-1 and AS-1 to increase the vacuum a n d <br /> injection rate to the remaining wells VE-1 and AS-1 are positioned in an area <br /> of low hydrocarbon concentrations <br /> On October 3, 2002, ASE also closed VE-7 and AS-7 to increase the vacuum a n d <br /> injection rate to the remaining wells VE-7 and AS-7 are positioned in an area <br /> of low hydrocarbon concentrations <br /> Flow Rate <br /> . While operating, the system injected an average of 49 cubic feet per minute <br /> (cfm) of air into the 5 AS well manifold, and extracted an average of 72 cfm o f <br /> petroleum-hydrocarbon laden air from the 5 VE well manifold The IC engine <br /> operated typically at 1800 RPM <br /> Maintenanc <br /> The IC engine was turned off each 220 to 250 hours of operation to perform <br /> routine maintenance activities Scheduled maintenance included lube, oil and <br /> filter for the engine and blowers, and draining of the moisture knock-out <br /> drum <br /> s <br /> Frank's One Stop Remediation System Monthly Report — October 2002 <br /> -2- <br />