My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0003642
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2072
>
2900 - Site Mitigation Program
>
PR0505553
>
ARCHIVED REPORTS_XR0003642
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 4:37:13 PM
Creation date
7/23/2020 3:55:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0003642
RECORD_ID
PR0505553
PE
2960
FACILITY_ID
FA0006856
FACILITY_NAME
FRANKS FOOD MART
STREET_NUMBER
2072
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
94336
APN
22202001
CURRENT_STATUS
01
SITE_LOCATION
2072 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WATER SAMPLEANALYTICAL RESULTS <br /> • The only compound identified in sample 17950-INF-10 29 O1 (the pre- <br /> treated water sample) was MTBE at 54 ppb <br /> • The only compound identified in sample 17950-AS-11 07 01 (after <br /> treatment by the air-stripper) was MTBE at 41 ppb <br /> • No compounds were identified in sample 17950-GAC 1-1 1 07 01, which <br /> was collected after carbon canister number 1 This proves that the <br /> treatment system is working as designed <br /> REMOVAL OF ALTERNATIVE WATER STTPI!I, <br /> The Aeropure Water alternative water supply was removed from the <br /> property in the middle of November, 2001 <br /> QUARTERLY OPERATION AND MAINTENANCE, SAMPLING AND <br /> REPORTI <br /> ASE is currently under contract to perform quarterly operation and <br /> maintenance (4&M) activities and collect samples and prepare a report <br /> every 3 months to determine the effectivenes of the treatment system <br /> ASE will visa the site periodically to check the performance of the system, <br /> backflush the carbon canisters, if necessary, and repair any problems that <br /> arise <br /> ASE will also collect influent, after air-stripper, and after carbon canister <br /> water samples every three months for analysis of TPH-G, BTEX, the five <br /> fuel oxygenates, and lead scavengers by EPA Method 8260B ASE will <br /> prepare and issue a report in the following month that details the <br /> quarter's activities Should it be determined that hydrocarbons are <br /> breaking-through the first carbon canister, ASE will replace that canister <br /> with a new one <br /> A copy of the quarterly report will go to the property owner, tenants, o u r <br /> client, and the appropriate regulatory agencies <br /> - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.