Laserfiche WebLink
a uascerrc <br /> -� q e <br /> .�POW it. MMI engineers inc. <br /> WELL SAMPLING FIELD LOG <br /> Project Name and Address: 1--0, 3 _ <br /> Job # y9p _ Date of <br /> Y <br /> sampling- <br /> Well Name ,-yr�y-/� Sampled b �— <br /> Total depth of well (feet): Well diameter (inches) <br /> Depth to water before sampling (feet): f 3_y5 _ - <br /> Thickness of floating product if any —_ <br /> Depth of well casing in water (feet) _q.01 r —� <br /> Number of gallons per well casing volume (gallons) <br /> Number of well casing volumes to be removed <br /> Req'd volume of groundwater to be purged before samp__ling (ga gallons) Z.3 <br /> Equipment used to purge the well. �•�,%tom <br /> Time Evacuation Began ISS Time Evacuati__on Finished /_iia — <br /> d <br /> Approximate volume of groundwater purge <br /> Did the well go drys After how many gallons �'- <br /> Time samples were collected — /OIS �-"— <br /> • Depth to water at time of sampling <br /> Percent recovery at time of sampling- <br /> Samples collected with ���-- <br /> Sample color e*% odor <br /> Description of sediment in sample s, /t - ^- - <br /> CHEMICAL DATA - <br /> Volume„ purged Temp P-H Conduutiviu <br /> --- z 71.c) 7 KZ <br /> SAMPLES COLLECTED <br /> Sa, rnpte # of (.Onlain= Volume & tyl2e contaener prey 1_ecdADALy Anasus <br /> _--__---------------- <br /> . ------ --------- -------------------- --- ----- ---� ----- <br />