Laserfiche WebLink
1 6.0 RECOMMENDATIONS <br />' ASE recommends continued quarterly groundwater monitoring at the site <br /> The next monitoring event is scheduled for the month of March 2003 <br /> t7.0 REPORT LIMITATIONS <br />' The results presented in this report represent the conditions at the time of <br /> the groundwater sampling, at the specific locations where the groundwater <br /> samples were collected, and for the specific parameters analyzed by the <br />' laboratory It does not fully characterize the site for contamination <br /> resulting from sources other than the former underground storage tanks <br /> and associated plumbing at the site, or for parameters not analyzed by the <br />' laboratory All of the laboratory work cited in this report was prepared <br /> under the direction of independent CAL-EPA certified laboratory The <br />' independent laboratory is solely responsible for the contents and <br /> conclusions of the chemical analysis data <br /> I <br /> Frank's One Stop Quarterly Report — December 2002 Sampling <br /> -4- <br />