My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
15833
>
1300 - Housing Abatement Program
>
PR0542560
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/7/2021 9:28:27 AM
Creation date
7/23/2020 4:05:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1300 - Housing Abatement Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0542560
PE
1322
FACILITY_ID
FA0024473
FACILITY_NAME
SINGH, AVTAR & KULJIT
STREET_NUMBER
15833
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
MANTECA
Zip
95337
APN
19805020
CURRENT_STATUS
02
SITE_LOCATION
15833 S AIRPORT WAY
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\ssangalang
Tags
1300-Public
Description:
Access to EHD-Public for 1300 Program Code - CDD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRAMENTO Contras 71157-0 20 818194 519-8780 <br /> a8 NATIONAL DR STE 70 <br /> SACRAMENTO,CA 95834-1979 Inspection Date: 02109/2018 <br /> AERMINIX, 9164192936 <br /> Inspector: COOLEY,TYRON <br /> FLOOR PLAN <br /> GENERAL TREATMENT SPECIFICATIONS <br /> 117 Trench or trench/rod soil adjacent to exterior 117A Vertically drill exterior attached slabs and treat soil <br /> foundation walls beneath along point of attachment <br /> Excavate soil beneath dirt-filled porch slab at Vertically drill the dirt-filled porch slab and treat the <br /> 118 point(s) of attachment to the structure and 120 soil beneath the slab along the point(s) of <br /> treat soil beneath attachment to the structure <br /> 121A Drill the exterior foundation wall of a crawl space or basement from the inside and treat the soil immediately <br /> beneath the dirt-filled porch slab by short-rodding along the point(s) of attachment to the structure <br /> Drill through each side of the dirt-filled porch foundation wall at no greater than 12" intervals and treat the <br /> 1219 soil immediately beneath the dirt-filled porch slab by short-rodding along the entire inside perimeter of the <br /> DFP <br /> 121C Drill foundation walls of the dirt-filled porch and treat the soil immediately beneath the slab by long-rodding <br /> adjacent to the entire inside perimeter of the DFP <br /> 128 Trench, remove, and treat soil by the Backfill 129 Drill and treat voids of a double brick foundation <br /> Method (see label) wall at 12" intervals or less <br /> 130 Drill and treat voids of a stone foundation wall 131 Drill and treat voids of a triple brick foundation wall <br /> at 12" intervals or less at 12" intervals or less <br /> 132 Drill and treat voids of a hollow block 133 Drill and treat voids of a brick veneer foundation <br /> foundation wall at 12" intervals or less wall at 12" intervals or less <br /> 134 Drill and treat all voids of a chimney at 12" 138 Drill and treat a subterranean termite infested <br /> intervals or less wooden sill or plate <br /> treat a subterranean termite infested Drill into voids of termite infested wood and inject <br /> 140 Drill Drillnd145 products to inaccessible voids ,termite galleries <br /> wooden and joist/ <br /> o termite shelter Make multiple openings into carton nests in building <br /> 145 Make small openings 147 voids or in trees and make multiple injections of <br /> tubes and inject product inside <br /> products to varying depths <br /> 160 Trench,trench and rod, or rod soil of planter box adjacent to the exterior foundation wall according to state <br /> specific treatment standards or to label directions,whichever apply <br /> 501 Install In-ground Monitoring Station <br /> NON-CHEMICAL TREATMENT SPECIFICATIONS <br /> 101 Provide at least 14" clearance between wood 102 Install access to ceiling of basement for inspection <br /> and soil in the crawl space and/or treatment <br /> 104 Install door/s to provide access for treating 105 Install crawl space access door <br /> soil adjacent to plumbing <br /> Remove cellulose debris and/or any other debris <br /> 106 Install Automatic Vents 109 that would interfere with inspection or treatment in <br /> the crawl space <br /> 109A Remove form boards 110 Scrape off termite tunnels <br /> 111 Set wooden supports on concrete pads to 135 Cut off stucco at least 3" above grade and remove <br /> properly insulate wood to soil contact stucco below grade <br /> 149 Remove wood to ground contacts 152 Break ground contact on step stringers <br /> 161 Prepare floor surface for drilling 205 Install a vapor barrier over the soil of a crawl space <br /> 206 Install floor supports to provide additional <br /> support <br />
The URL can be used to link to this page
Your browser does not support the video tag.