Laserfiche WebLink
1 ) Implement the scope of work presented in ASE's workplan dated <br /> . � October 8, 1999 ASE is currently awaiting pre-approval of the <br /> funds from the UST Cleanup Fund to complete this work <br /> 2 ) Reduce the frequency of free-floating hydrocarbon measurements <br /> and bailing to monthly <br /> 7.0 REPORT LIMITATIONS <br /> The results of this report represent the conditions at the time of t h e <br /> groundwater sampling, at the specific locations where the groundwater <br /> samples were collected, and for the specific parameters analyzed by the <br /> laboratory It does not fully characterize the site for contamination <br /> resulting from sources other than the former underground storage tanks <br /> and associated plumbing at the site, or for parameters not analyzed by the <br /> laboratory All of the laboratory work cited in this report was prepared <br /> under the direction of independent CAL-EPA certified laboratory The <br /> independent laboratory is solely responsible for the contents a n d <br /> conclusions of the chemical analysis data <br /> Aqua Science Engineers appreciates the opportunity to provide <br /> environmental consulting services to Frank's One Stop, and trust that this <br /> report meets your needs Please feel free to call us at (925) 820-9391 if <br /> you have any questions or comments <br /> Respectfully submitted, <br /> �D�'FO <br /> AQUA SCIENCE ENGINEERS,INC *� �F, �a <br /> Robert E Kitay, G , R E A <br /> Senior Geologist OFC <br /> Attachments Figures 1 through 5 <br /> Appendices A and B <br /> cc Mr Frank Guinta <br /> Mr Don Thompson <br /> Mr Ron Rowe, San Joaquin County PHS - EHD <br /> Mr Mark List, RWQCB, Sacramento Valley Region <br /> r <br /> Frank's One Stop Quarterly Report — December 1999 Sampling <br /> -5- <br />