Laserfiche WebLink
Regional Water Quality Control Board �y4, <br /> California Regiok Central Valley Region l� ` a� <br /> Robert Schneider, Chair <br /> n H Htckox Gray Davis <br /> Secretaryfor Sacramento Main Office Governor <br /> Environmental Internet Address http//www swrcb ca gov/rwgcb5 <br /> Protection 3443 Routter Road,Suite A,Sacramento,California 95827 3003 <br /> Phone(916)255-3000 FAX(916)255-3015 <br /> 22 September 2003 <br /> Mr Frank and Mrs Shen Guinta Mr James and Mrs Manlyn Ramsey <br /> Guinta Enterprises 200 Rowdy Creek Road <br /> 305 North Union Road Snaith River, CA 95567 <br /> Manteca, CA 95336 <br /> WORKPLAN FOR ADDITIONAL GROUNDWATER CHARACTERIZATION, <br /> FRANK'S ONE STOP, 2072 WEST YOSEMITE A VENUE, MANTECA, <br /> CLEANUP AND ABATEMENT ORDER NO R5-2003-0713, SAN JOAQUIN COUNTY <br /> I have reviewed the Workplan For Additional Groundwater Characterization (Workplan), <br /> submitted on your behalf by ASE Environmental on 15 September 2003, in accordance with the <br /> requirement for an Additional Groundwater Characterization in the Regional Board Cleanup and <br /> Abatement Order(CAO) No R5-2003-0713 The Workplan proposes the installation of thirteen <br /> additional depth-discrete groundwater monitoring wells (wells) at five offsite locations (see <br /> enclosed map for locations) The proposed well locations were previously characterized for <br /> lithology and contaminant concentrations in depth-discrete groundwater analyses by Cone <br /> Penetrometer Test (CPT) borings CPT-17, CPT-1 S, CPT-21, CPT-25, and CPT-26 Two to three <br /> individual wells, screened across targeted permeable sand intervals (preferential pathways), are <br /> proposed for each location <br /> While the proposed work is necessary and appropriate to begin the offsite characterization of the <br /> groundwater plume, the proposed work will not complete the plume definition The additional <br /> work outlined below will be required to fulfill the requirements in CAO No R5-2003-0713 I <br /> recommend that you proceed immediately to implement the Workplan with the listed <br /> modifications in order to assess whether a second phase of fieldwork is necessary All <br /> groundwater characterization is to be completed and reported by 1 February 2004 Failure to <br /> completely define the contaminant plume(s), and or submit a complete Corrective Action Plan by <br /> 1 April 2004 may result in further enforcement actions, including Accrued Civil Liabilities <br /> (fines) Note that an Interim Effectiveness Report for the groundwater remediation system is due <br /> by 15 November 2003. <br /> The Workplan is approved for the first phase of the investigation with the following <br /> modifications Please address these additions satisfactorily in a supplemental letter to me prior to <br /> commencing fieldwork <br /> California En viron in en tal Protection Agency <br /> �3 Recycled Paper <br /> The enei gy challenge facing California is real Every Californian needs to take immediate action to reduce energy consumption <br /> For a list of simple ways you can reduce demand and cut your enemy costs see our Web-site at http//www swrcb ca gov/rwgcb5 <br />