Laserfiche WebLink
1. r <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1 0 INTRODUCTION 1 <br /> 2 0 SITE HISTORY AND BACKGROUND INFORMATION 1 <br /> 2 1 February 1995 Site Assessment 1 <br /> 2 2 April 1997 Site Assessment 1 <br /> 2 3 May 1998 Site Assessment 2 <br /> 2 4 June 1998 UST Removal and Contaminated Soil Excavation 2 <br /> 2 5 August 1998 Area Well Survey 3 <br /> 2 6 April 1999 CPT Borings 3 <br /> 2 7 May 1999 Monitoring Well Installation 4 <br /> 2 8 August 1999 Quarterly Groundwater Monitoring 4 <br /> 2 9 Bi-Weekly Free-Floating Hydrocarbon Measurement and <br /> Removal 5 <br /> 2 10 December 1999 Area Well Survey 5 <br /> 2 11 March 2000 Monitoring Well Installation 5 <br /> 2 12 July, August and September 2000 Domestic Well Sampling 6 <br /> 2 13 August 2000 Feasibility Tests and Interim Remediation <br /> System Workplan 6 <br /> 2 14 September 2000 Interim Remediation System Installation 6 <br /> 2 15 September 2000 Alternative Water Source for Impacted <br /> Properties 6 <br /> 2 16 September 2000 CPT Drilling and Monitoring Well <br /> Installation 7 <br /> 2 17 November 2000 Monitoring Well Resampling 8 <br /> 2 18 December 2000 Groundwater Sampling 8 <br /> 2 19 January 2001 Video and Cement-bond Log Survey 9 <br /> 2 20 January 2001 CPT Drilling North of the Site 9 <br /> 2 21 January 2001 On-Site Geoprobe Drilling 10 <br /> 2 22 February 2001 Groundwater Sampling 10 <br /> 2 23 May 2001 Treatment System Installation at 17933 Airport <br /> Way 1 1 <br /> 224 Alternative Water Supply Update 1 1 <br /> 2 24 June 2001 Destruction of Domestic Well at 17933 Airport <br /> Way 1 1 <br /> 2 26 June 14, 2001 Discovery of Free-Floating Hydrocarbons 1 2 <br /> 3 0 DISCUSSION REGARDING REMEDIATION AT THE SITE 12 <br />