Laserfiche WebLink
4 . 0 SCHEDULE <br /> ASE will begin work foi this assessment immediately upon approval of this <br /> workplan by the San Joaquin County PHS-EHD and pre-approval of the <br /> costs from the UST Cleanup Fund As I have already discussed with Mr <br /> Ron Rowe of the San Joaquin County PHS-EHS, given the depths a n d <br /> difficulty in drilling at the site, only a very large CPT will be suitable for <br /> this project The only CPT that we aie aware of that could complete this <br /> piolect in a timely manner is not available until the week of November 7 , <br /> 2000 Since at least three weeks of drilling will be required, it is very <br /> unlikely that a comprehensive report can be completed by the December <br /> 18, 2000 deadline ASE will provide you will all infoimation as it becomes <br /> available, and will Strive to meet the December 18, 2000 deadline, <br /> however, it is unlikely that any report generated by Decembei 18, 2000 <br /> will be complete will cross-Sections, mass flux calculations and flownets <br /> ASE may need to provide this infoimatton in an addendum if the <br /> Decembei 18, 2000 deadline cannot be extended If it can be extended, <br /> ASE requests that it be extended at such a time that a reasonable deadline <br /> can be established based on the progress of field activities Please be <br /> assured that this pioject is ASE's top priority and that it will ii-love foiwaid <br /> • as quickly as possible <br /> Should you have any questions or comments, please call us at (925) 820- <br /> 9391 <br /> Respectfully submitted, <br /> AQUA SCIENCE ENGINEERS, INC �`'�•� RAD �O� <br /> Nm 6w s <br /> Robert E Kit , RG , R E A N� P /°Z' <br /> Senior Geologist OF CA��F�� <br /> • <br /> Frank's One Stop Workplan — September 2000 <br /> -12- <br />