Laserfiche WebLink
TABLE OF CONTENTS <br /> ,y <br /> SECTION PAGE <br /> 1 0 INTRODUCTION 1 <br /> 2 0 SITE HISTORY AND BACKGROUND INFORMATION 1 <br />�y <br /> 2 1 February 1995 Site Assessment 1 <br /> 2 2 April 1997 Site Assessment 1 <br /> 2 3 May 1998 Site Assessment 2 <br /> 2 4 June 1998 UST Removal and Contaminated Soil Excavation 2 <br /> 2 5 August 1998 Area Well Survey 3 <br /> 2 6 April 1999 CPT Borings 3 <br /> 2 7 May 1999 Monitoring Well Installation 4 <br /> 2 8 August 1999 Quarterly Groundwater Monitoring 4 <br /> 2 9 Bi-Weekly Free-Floating Hydrocarbon Measurement and <br /> Removal 5 <br /> 2 10 December 1999 Area Well Survey 5 <br /> 2 11 March 2000 Monitoring Well Installation 5 <br /> 2 12 July, August and September 2000 Domestic Well Sampling 6 <br /> 2 13 August 2000 Feasibility Tests and Interim Remediation <br /> System Workplan 6 <br /> 2 14 September 2000 Interim Remediation System Installation 7 <br /> 2 15 September 2000 Alternative Water Source for Impacted <br /> Properties 7 <br /> 3 0 SCOPE OF WORK 7 <br /> i 4 0 DRILLING SOIL BORINGS AND COLLECTING SAMPLES 9 <br /> 4 1 Permits 7 <br /> 4 2 CPT Drilling 9 <br /> 4 3 Drilling and Soil Sample Collection 9 <br /> 44 Decontamination and Disposal of Steam-Cleaning Rinsate <br /> and Drill Cuttings 10 <br /> L 5 0 SUBSURFACE LITHOLOGY AND HYDROGEOLOGY 1 1 <br /> 6 0 ANALYTICAL RESULTS FOR SOIL 1 1 <br />