Laserfiche WebLink
TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1 0 INTRODUCTION I <br /> 2 0 SITE HISTORY AND BACKGROUND INFORMATION 1 <br /> 2 1 February 1995 Site Assessment 1 <br />' 2 2 April 1997 Site Assessment 1 <br /> 2 3 May 1998 Site Assessment 2 <br /> 2 4 June 1998 UST Removal and Contaminated Soil Excavation 2 <br /> 2 5 August 1998 Area Well Survey 3 <br /> 2 6 April 1999 CPT Borings 3 <br /> 2 7 May 1999 Monitoring Well Installation 3 <br /> 2 8 August 1999 Quarterly Groundwater Monitoring 4 <br /> 2 9 Bi-Weekly Free-Floating Hydrocarbon Measurement and <br /> Removal 5 <br /> 2 10 December 1999 Area Well Survey 5 <br /> 3 0 SCOPE OF WORK 5 <br /> I 4 0 DRILLING SOIL BORINGS FOR THE INSTALLATION OF <br /> GROUNDWATER MONITORING WELLS AND PIEZOMETERS AND <br /> COLLECTING SAMPLES 7 <br /> I4 1 Permits 7 <br /> 4 2 Drilling and Soil Sample Collection 7 <br /> I4 3 Decontamination 8 <br /> 5 0 SUBSURFACE LITHOLOGY AND HYDROGEOLOGY 8 <br /> 6 0 ANALYTICAL RESULTS FOR SOIL 8 <br /> I 7 0 MONITORING WELL INSTALLATION, DEVELOPMENT AND <br /> SAMPLING 9 <br /> I <br /> 7 1 Monitoring Well Installation 9 <br /> 7 2 Monitoring Well Development 10 <br /> 7 3 Monitoring Well Sampling 10 <br /> 7 4 Purge Water Disposal I 1 <br />