My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2005-CURRENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
SITE INFORMATION AND CORRESPONDENCE_2005-CURRENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 4:48:43 PM
Creation date
7/23/2020 4:30:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2005-CURRENT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment B • • WDID#513390104001 <br /> CITY OF MANTECA <br /> Water Quality Control Facility <br /> Non-Discharge Violations Contributing to Calculation of Penalty <br /> Contributes to <br /> Requirement Non-Compliance Notes Calculation of <br /> Penalty <br /> Provisions H.1 — Workplan/Time Schedule submitted Discharger expects to meet final Yes <br /> Compliance with Title 22 111 days late compliance by end of 2007 (Final <br /> Disinfection Compliance required 1 February <br /> 2009) <br /> Provisions H.2—Title 22 Workplan/Time Schedule submitted Discharger expects to meet draft Yes <br /> Engineer's Report 234 days late and final report deadlines <br /> Provisions H.5—Thermal Workplan and Schedule due Discharger expects to submit Yes <br /> Study 1 September 2004 workplan 7-8 months late <br /> Provisions H.6—Pollution Draft Workplan/Time Schedule Discharger expects to meet final Yes <br /> Prevention Plan for Mercury submitted 142 days late compliance date <br /> Provisions H.7—SIP Dioxin Technical report due 1 November Late due to lab error, Discharger No <br /> Study 2004 submitted technical report on <br /> 15 February 2005 <br /> Provisions H.8— Technical Report due 1 May 2005. Discharger provided notification of Yes <br /> Assessment of groundwater Discharger failed to evaluate non-compliance by memorandum <br /> quality impacts groundwater well network. dated 2 March 2005, expect <br /> Background wells not installed, submittal 18 months late <br /> therefore, cannot meet compliance <br /> date. <br /> Provisions H.10— Technical Report due 1 August Discharger expects submittal by Yes <br /> Assessment of Land 2004 end of April 2005 (8 months late) <br /> Disposal Capacity <br /> CDO Item #2—Compliance . No implementation schedule Constructing nitrification/ No <br /> with effluent limitations for submitted denitrification facilities to meet <br /> aluminum, arsenic, copper, . Pollution Prevention Plans Nitrate-N effluent limitations. <br /> cyanide, iron, manganese, expected 5-6 months late Mandatory penalties assessed for <br /> MBAS, nitrate, nitrite, and . No progress report submitted violations of final effluent limits <br /> Receiving Water Limitations 1 January 2005 due to non-compliance with CDO. <br /> F.2 and F.3 <br /> CDO Item #5—Compliance . No plans and implementation Yes <br /> with temperature effluent schedule submitted <br /> and receiving water . Thermal Plan Exception report <br /> limitations expected over a year late <br /> Fully implement a Failure to fully implement Yes <br /> pretreatment program pretreatment program, Provisions <br /> pursuant to CFR Part 403 H.21 requires implementation by <br /> and Provisions H.21 1 October 2004. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.