My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Burrowing Owl <br /> The City will prevent ground squirrels from occupying the project site early in the planning process by employing <br /> one of the following practices: <br /> ► New vegetation will be planted or existing vegetation will be retained entirely covering the site at a height of <br /> approximately 36 inches above the ground.Vegetation will be retained until construction begins. <br /> ► If burrowing owls are not known or suspected on a project site,the City will disk or plow the entire project <br /> site to destroy any ground squirrel burrows. At the same time burrows are destroyed, ground squirrels will be <br /> removed through one of approved methods described in Appendix A of the SJMSCP to prevent reoccupation <br /> of the project site (also found at http://www.sjcog.oro. If these measures are not attempted or are attempted <br /> but fail, and burrowing owls occupy the project site,then the following measures will be implemented: <br /> • During the nonbreeding season(September 1–January 31),burrowing owls occupying the project site will <br /> be removed from the project site by passive relocation as described in DFG's Staff Report on Burrowing <br /> Owl Mitigation (DFG 1995). <br /> • During the breeding season(February 1–August 31), occupied burrows will not be disturbed and will be <br /> provided with a 75-meter protective buffer until the Technical Advisory Committee (TAC)—with the <br /> concurrence of the permitting agencies' representatives on the TAC—or a qualified biologist approved by <br /> the permitting agencies verifies through noninvasive means that either the birds have not begun egg <br /> laying, or juveniles from the occupied burrows are foraging independently and are capable of independent <br /> survival. Once the fledglings are capable of independent survival,the burrow can be destroyed. <br /> White-Tailed Kite <br /> Before the start of any ground-disturbing activities (e.g.,project site grading),preconstruction surveys will <br /> investigate all potential nesting trees on the project site(e.g., especially tree tops 15-59 feet above the ground in <br /> oak,willow, eucalyptus, cottonwood, or other deciduous trees), during the nesting season(February 15– <br /> September 15)whenever white-tailed kites are noted on-site or within the vicinity of the project site during the <br /> nesting season. A setback of 100 feet from nesting areas will be established and maintained during the nesting <br /> season for the period encompassing nest building and continuing until fledglings leave nests. This setback applies <br /> whenever construction or other ground-disturbing activities must begin during the nesting season in the presence <br /> of nests that are known to be occupied. Setbacks will be marked by brightly colored temporary fencing. <br /> Northern Harrier <br /> A setback of 500 feet from nesting areas will be established and maintained during the nesting season for the <br /> period encompassing nest building and continuing until fledglings leave nests. This setback applies whenever <br /> construction or other ground-disturbing activities must begin during the nesting season in the presence of nests <br /> that are known to be occupied. Setbacks will be marked by brightly colored temporary fencing. <br /> Common Raptors <br /> ► If project activity would occur during the raptor nesting season(February 15–September 15),preconstruction <br /> surveys will be conducted during the nesting season in suitable nesting habitat within 100 feet of areas of <br /> project activity. The survey will be conducted within 2 weeks before the beginning of construction or tree <br /> removal. <br /> ► A setback of 100 feet from active nesting areas will be established and maintained during the nesting season <br /> for the period encompassing nest building and continuing until fledglings leave nests. This setback applies <br /> whenever construction or other ground-disturbing activities must begin during the nesting season in the <br /> Manteca WQCF and Collection System Master Plans EIR EDAW <br /> City of Manteca 4.5-35 Terrestrial Biological Resources <br />
The URL can be used to link to this page
Your browser does not support the video tag.