My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M m <br /> X p <br /> Table 2-2 <br /> CD Summary of Impacts and Mitigation Measures <br /> Cn <br /> Significance Significance <br /> v Impacts Before Mitigation Measures After <br /> Mitigation Mitigation <br /> 3. Staging areas for heavy-duty construction equipment shall <br /> be located as far as possible from sensitive receptors. <br /> 4. Use alternative fueled or catalyst equipped diesel <br /> construction equipment,where reasonable available,such as <br /> equipment capable of using biodiesel or emulsified fuel. <br /> Alternative fuels and NOx reduction equipment should be <br /> ARB-certified. <br /> 5. Limit the hours of operation of heavy duty equipment and/or <br /> the amount of equipment in use at any one time. <br /> 6. Curtail construction during periods of high ambient <br /> pollutant concentrations;this may include ceasing of <br /> construction activity during the peak-hour of vehicular <br /> traffic on adjacent roadways or on Spare the Air Days. <br /> I' Implementation of Mitigation Measures 4.3-1A and D would result in <br /> Z' the required minimum 20%reduction in NOx emissions and a 45% <br /> reduction in PMIo emissions from heavy-duty diesel equipment,as <br /> compared with statewide average emissions.In addition, <br /> implementation of these measures would also result in a 5% <br /> reduction in ROG emissions from heavy-duty diesel equipment.All <br /> CD <br /> or part of the reductions may result from on-site equipment and fuel <br /> selection;the remainder would result from off-site reductions <br /> p achieved through the payment of fees.Implementation of these <br /> v measures would reduce temporary, short-term,construction-related <br /> Q emissions of ROG and NOx generated by the proposed project,but <br /> o not to a less-than-significant level,as emissions would still exceed <br /> CD SJVAPCD's significance thresholds.As a result,this impact <br /> o (generation of construction-related NOx emissions)would remain <br /> C significant and unavoidable. <br /> m With respect to fugitive PMIo dust emissions,implementation of <br /> Mitigation Measures 4.3-1B and C would ensure compliance with <br /> 0 v Regulation VIII,which is required by law,and include additional <br /> 0 <br /> SJVAPCD-recommended control measures.As a result,this impact <br /> v (generation of construction-related fugitive PMIo dust emissions) <br /> would be reduced to a less-than-significant level. <br /> M m <br /> v �u <br /> LTS=Less than Significant S=Significant PS=Potentially Significant SU=Significant and Unavoidable <br />
The URL can be used to link to this page
Your browser does not support the video tag.