Laserfiche WebLink
M m <br /> C) Table 2-2 <br /> Summary of Impacts and Mitigation Measures <br /> W Significance Significance <br /> 3 Impacts Before Mitigation Measures After <br /> Mitigation Mitigation <br /> whether these technologies would limit odor complaints to less averaged over three years.No further odor reduction measures are <br /> than one per year,which is the significance standard used by the feasible.Therefore,this impact would remain significant and <br /> SJVAPCD for significant odor problems.No other feasible odor unavoidable. <br /> control technologies are available to reduce the intensity of <br /> odors at the WQCF site and that would guarantee that odor <br /> complaints would be limited to one per year.Therefore,this <br /> impact would be significant and unavoidable. <br /> 4.4 Noise <br /> 4.4-1: Short-Term Increases in Construction Source Noise PS 4.4-1: Short-Term Increases in Construction Source Noise LTS <br /> Levels.If construction activities were to occur during the more Levels.To reduce the exposure of noise-sensitive receptors to <br /> noise-sensitive hours or if construction equipment were not project-generated construction source noise levels,the City will <br /> properly equipped with noise control devices,construction- implement the following measures: <br /> generated source noise could result in the exposure of persons to . Limit all construction activities within the city to the hours from <br /> or generation of noise levels in excess of applicable standards, 7 a.m.to 7 p.m.to ensure compliance with Section 17.13.04(A) <br /> ^' could result in annoyance and/or sleep disruption to occupants of of the City of Manteca Municipal Code. <br /> any existing noise-sensitive land uses in the project vicinity, . Limit all construction activities within the county,or affected by <br /> and/or could create a substantial temporary increase in ambient the County,to the hours from 6 a.m.to 9 p.m.to ensure <br /> noise levels.As a result,this impact would be potentially compliance with the San Joaquin County Development Code <br /> significant. (Section 9-1029.9[C][3]). <br /> CD ► Properly maintain and equip all construction equipment with <br /> noise control,such as mufflers,in accordance with <br /> p manufacturers' specifications. <br /> T ► Place noisy stationary equipment(e.g.,compressors,generators) <br /> Qaway from existing off-site noise-sensitive receptors and/or <br /> o provide acoustical shielding. <br /> CD <br /> 4.4-2:Long-Term Increases in Traffic Source Noise Levels. LTS No mitigation is necessary. LTS <br /> Because operation would generate few traffic trips in <br /> W comparison to existing traffic volumes on local roadways,the <br /> m proposed project would not result in a noticeable change in the <br /> traffic noise contours of area roadways.Thus,long-term <br /> n v increases in traffic source noise levels would not result in the <br /> 0 <br /> exposure of persons to or generation of noise levels in excess of <br /> v applicable standards or create a substantial permanent increase <br /> Cn in ambient noise levels at existing noise-sensitive receptors.As a <br /> M result,this impact would be less than significant. <br /> v 56 <br /> LTS=Less than Significant S=Significant PS=Potentially Significant SU=Significant and Unavoidable <br />