My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
2450
>
2900 - Site Mitigation Program
>
PR0506303
>
ARCHIVED REPORTS_DRAFT ENVIRONMENTAL IMPACT REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2020 5:02:58 PM
Creation date
7/23/2020 4:33:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
DRAFT ENVIRONMENTAL IMPACT REPORT
RECORD_ID
PR0506303
PE
2965
FACILITY_ID
FA0001086
FACILITY_NAME
MANTECA PUBLIC WORKS
STREET_NUMBER
2450
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
24130050
CURRENT_STATUS
01
SITE_LOCATION
2450 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
736
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
distribution system are shown in Exhibit 3-3. All WQCF improvements,with the exception of the parallel 48-inch <br /> outfall pipe and side-bank outfall structure,would be located on-site,within the existing WQCF boundaries. The <br /> specific schedule for construction of facilities would be determined by actual flow and load increases,permit <br /> conditions, and operational needs (Table 3-3). Proposed master plan facilities are described in more detail below. <br /> Table 3-3 <br /> WQCF and Collection System Master Plans Update Projects' <br /> Description Phase IV Construction Phase V Construction <br /> Start Completion Start Completion <br /> Aerated Grit Tanks 10/2010 4/2012 4/2020 4/2022 <br /> Primary Sedimentation Basins 10/2010 4/2012 4/2020 4/2022 <br /> Aeration Basins 10/2010 4/2012 4/2020 4/2022 <br /> Secondary Clarifiers 10/2010 4/2012 4/2020 4/2022 <br /> Dissolved Air Flotation Units 10/2010 4/2012 4/2020 4/2022 <br /> Secondary Effluent Filters 10/2010 4/2012 4/2020 4/2022 <br /> Rapid Mixing and Flocculation Tanks 10/2010 4/2012 4/2020 4/2022 <br /> Ultraviolet Disinfection Channels and Effluent Pumps 10/2010 4/2012 4/2020 4/2022 <br /> Secondary Effluent Equalization Pond 10/2010 4/2012 - - <br /> Anaerobic Sludge Digesters,Heating,and Cogeneration Facilities 10/2010 4/2012 4/2020 4/2022 <br /> Sludge Dewatering Centrifuge - - 4/2020 4/2022 <br /> Outfall Pipeline(48-inch)and Side-Bank Structure 10/2010 4/2012 - - <br /> Chemical Handling Building 10/2010 4/2012 - - <br /> North Manteca Trunk Sewer 10/2010 4/2012 - - <br /> South Manteca Trunk Sewer 10/2010 4/2012 - - <br /> Central Manteca Trunk Sewer 10/2010 4/2012 - - <br /> Union Ranch Pump Station 10/2010 4/2012 - - <br /> Southwest Manteca Pump Station 10/2010 4/2012 - - <br /> Tara Park Pump Station(Interim) 10/2010 4/2012 - - <br /> Recycled Water Distribution System 10/2010 4/2012 <br /> Note: <br /> Estimated based on master plan and recent planning estimates. <br /> Source:Nolte Associates 2006 <br /> PROPOSED LIQUID STREAM TREATMENT FACILITIES <br /> Primary Treatment <br /> The proposed project would construct seven aerated grit tanks and 10 primary sedimentation basins at the SSF. <br /> The grit tanks would remove relatively high-density inorganic particles(e.g., sand) from the wastewater. Once <br /> separated from the wastewater, grit will settle into the hoppers in the bottom of the tanks. Grit collected in the <br /> hoppers will be discharged to a grit classifier by gravity for further concentration and washing of light organic <br /> material trapped with the grit. Concentrated and washed grit discharged from the classifier will be conveyed into a <br /> dumpster and periodically hauled to a landfill for disposal. Wash water from the classifier will be discharged into <br /> the plant drain system and returned to the influent pump station. <br /> The purpose of the primary sedimentation basins is to remove settleable solids and floatable scum. This is <br /> accomplished by providing a quiescent environment where particles with densities greater than water can settle <br /> Manteca WQCF and Collection System Master Plans EIR EDAW <br /> City of Manteca 3-19 Project Description <br />
The URL can be used to link to this page
Your browser does not support the video tag.