Laserfiche WebLink
sound attenuation features such as generator housing structures. Pumping station sites would typically be one- <br /> quarter acre or less. Interim and permanent pumping stations would be designed for service lives of 10 and 50 <br /> years respectively(Richard,pers. comm.,2006b). <br /> The proposed project would construct three large diameter trunk sewers to collect wastewater from the north, <br /> central, and south sections of the City(Exhibit 3-3). The north and south trunk sewers would collect flow from <br /> areas where future growth is expected,while the central trunk sewer would connect the existing collection system <br /> to the north trunk sewer. The proposed north trunk sewer would include 40 sewer segments that are 18-60 inches <br /> in diameter,while the south trunk sewer would include 50 sewer segments that are 8-60 inches in diameter. <br /> Measuring 6,442 feet(approximately 1.22 miles),the central trunk sewer would include 12 sewer segments that <br /> are 36 inches in diameter, and would eliminate the need for the existing Union Road pump station(City of <br /> Manteca 2006). <br /> The proposed project also includes several minor improvements to existing sewer lines. Hydraulic modeling and a <br /> review of historical records found no major deficiencies in the existing collection system;however, several minor <br /> problems were identified, including pipeline obstructions and miscellaneous flow problems. To address these <br /> problems,the proposed project includes a total of 11 collection system improvement projects, such as <br /> rehabilitating manholes and eliminating sagging pipelines. These improvements would generally be located <br /> within the existing collection system network. <br /> 3.7.4 CONSTRUCTION <br /> Construction of the proposed WQCF and Collection System Master Plan project would require approximately <br /> 80 construction personnel(30 for WQCF improvements, 30 for trunk sewer construction, and 20 for pump station <br /> construction). The precise number of construction workers would depend on the type of facilities being <br /> constructed,the number of simultaneous construction jobs, and the construction schedule. In general, construction <br /> activities for the WQCF,wastewater collection system, and recycled water distribution system would include site <br /> preparation, grading, excavation,trenching,backfilling,building construction, and pipeline installation. <br /> Equipment typically used for construction activities includes scrapers, earthmovers, dozers, cranes, compacters, <br /> graders, dump trucks, delivery trucks, loaders, and jackhammers. The quantities of each type of construction <br /> equipment would vary depending on the type of facility being constructed. <br /> On average, approximately 60 employee vehicle round trips per day and approximately 10 construction-related <br /> truck round trips per day would be required during WQCF and Collection System Master Plan project <br /> construction. <br /> Both the interim and permanent pumping stations would be predominantly below grade, and construction of each <br /> station would likely occur over an 18-month period. <br /> Collection system and outfall pipeline would be constructed in 12-foot segments, and construction would <br /> typically occur within a 25-foot wide corridor in public right-of-way within either existing or future paved streets. <br /> 3.7.5 OPERATIONS <br /> STAFFING <br /> The expanded WQCF would continue to be operated by City personnel.As required by law, operators are <br /> licensed by the State Water Resources Control Board(SWRCB). Typical WQCF operation involves flow routing; <br /> starting, stopping and adjusting pumps,blowers and other equipment;hosing down basins and equipment;reading <br /> flow meters and taking water samples for testing;performing laboratory tests and documenting results; and <br /> maintaining and repairing equipment. Currently, staffing at the WQCF consists of approximately 23 people, <br /> including supervisors, operators, laboratory personnel, and maintenance staff. Because the WQCF operates 24 <br /> Manteca WQCF and Collection System Master Plans EIR EDAW <br /> City of Manteca 3-23 Project Description <br />