Laserfiche WebLink
CERS Consolidated Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply), CB, <br /> ❑� L VERBAL WARNINGS; E 2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3.TELEPHONE; <br /> ❑4.PAGERS; ❑S.ALARM SYSTEM; d 6.PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Cheek all that apply). c12. <br /> ❑ 1.VERBAL WARNINGS; [12.PUBLIC ADDRESS OR INTERCOM SYSTEM; 0 3.TELEPHONE; <br /> ❑4.PAGERS; ❑5,ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: C3. <br /> PRIMARY EMERGENCY COORDINATORNANIE: Roy Fatherolf PHONE NO.: (209)275-5227 PHONE NO.: <br /> ALTERNATE EMERGENCY COORDINATORNAME: Thomas Espinoza PHONE NO.: (209)430-4996 PHONE NO.: <br /> IT Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Note:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procecknes for containing spills and preventing and mitigating releases,fires and/or explosions <br /> DI. <br /> ( 1. MONITOR FOR LEAKS,RUPTURES,PRESSURB BUILD-UP,ETC,; <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e.g.,Portable spill containment walls,built-in berms); <br /> ❑3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e,g„Pads,spill pigs,spill pillows); <br /> ❑4, COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> Q 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑7. ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> [+, 8. STOP PROCESSES AND/OR OPERATIONS; <br /> ❑9. AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> [110.SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> ❑` 11.CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ❑' 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> 0 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> E 14.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑ 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> M 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> ❑ 17.USE ABSORBENTMATERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE VACUUM(e.g,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> 7119.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21,OTHER(Specify): oz' <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIONAL(S)WILL BE USED TO BEGIN EVACUATION OF THE FACILITY(Check all that apply): 91, <br /> ❑ I, BELLS; ez. <br /> ❑2, HORNS/SIRENS; <br /> [E3 VERBAL(Le„Shouting); <br /> El 4, OTHER(Specify): Public Address System <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e.g.,Parking lot,street carne[): as. <br /> Softball Fields and Parking Lot <br /> Note:The Emergency Coordinator most account for all onsite employees and visitors after evacuation, <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: 24. <br /> ❑ 1.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑2.EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3, OTHER(Specify): Es. <br /> Note:Evacuation procedrves and/or maps should be pasted in visible facility locations and must be ineluded in the Contingency Plan. <br /> F, ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMEN'T'S FOR LOCAL EMERGENCY SERVICES(Check one of the following): Pi. <br /> ❑' L HAVE BEEN DETERMINED NOT NECESSARY; <br /> ❑ <br /> 1 THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): ¢1 <br /> Note;Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made(or your facility,if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />