My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MILO CANDINI
>
1077
>
1900 - Hazardous Materials Program
>
PR0529211
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2020 4:54:06 PM
Creation date
7/27/2020 8:22:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0529211
PE
1921
FACILITY_ID
FA0017990
FACILITY_NAME
BIG LEAGUE DREAMS SPORTS PARK
STREET_NUMBER
1077
STREET_NAME
MILO CANDINI
STREET_TYPE
DR
City
MANTECA
Zip
95337
APN
24131048
CURRENT_STATUS
01
SITE_LOCATION
1077 MILO CANDINI DR
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response/Contingency Plan <br /> FI. EARTHQUAKE VULNERABILITY <br /> Identify areas of the facility that are vulnerable to hazardous materials releases clue to seismic motion.These areas require immediate isolatlon and inspection. <br /> VULNERABLE AREAS(Check all that apply): Ht LOCATIONS(e.g.,Shop,outdoor shed,lab): H2, <br /> ❑+ 1.HAZARDOUS MATERIALS AND/OR WASTE STORAGE AREAS <br /> [-12.PROCESS LINES AND PIPING Restaurant supply roams <br /> ❑ 3.LABORATORY <br /> ❑ 4.WASTE TREATMENT AREA <br /> Identify mechanicals stems vulnerable to releases/spills due to emttr uaka-related motion.Theses stems require immediate isolation and inspection. <br /> VULNERABLE SYSTEMS AND/OR EQUIPMENT(Check all that apply): m. LOCATIONS: FC4 <br /> 1.SHELVES,CABINETS AND/OR RACKS Restaurant supply room <br /> Q 2.TANKS AND SHUT-OFF VALVES Restaurant supply room <br /> Q 3.PORTABLE GAS CYLINDERS Restaurant supply room <br /> ❑ 4.EMERGENCY SHUT-OFF AND/OR UTILITY VALVES <br /> 0 S.SPRINKLER SYSTEMS Restaurant kitchens <br /> ❑ 6.STATIONARY PRESSURIZED CONTAINERS(e.g,Propane tank) <br /> I. EMPLOYEE TRAINING <br /> Employee training is required for all employees and/or contractors handling hazardous materials and/or hazardous wastes during normal acrd/or emergency operations, <br /> Most facilities will need to submit a separate Training Plan.However,your CUPA may accept this section as the Training Plan for some small facilities. <br /> Employee training plans may include the following content: <br /> • Applicable laws and regulations; • Communication and alarm systems; <br /> + Emergency response plans and procedures; • Personal protective equipment; <br /> • Safety Data sheers, • Use and maintenance of emergency response equipment and supplies <br /> • Hazard communication rotated to health and safety; (egFire extinguishers,respirators,spill control materials); <br /> • Methods for safe handling of hazardous substances; • Decontamination procedures; <br /> • Hazards of materials and processes(eg,fire,explosion,asphyxiation); Evacuation procedures and evacuation staging locations; <br /> * Hazard mitigation,prevention and abatement procedures; • Idm infioadon of facility areas,equipment,and systems vulnerable to <br /> • Coordination of emergency response actions; earthquakes mrd other natural disasters. <br /> Notification procedures for local emergency responders,CUPA, • OTHER(Speuiiy): <br /> Cal OES,and onsite personnel; <br /> Check the applicable boxes below to indicate how the omployco training program is administered. <br /> Ell. FORMAL CLASSROOM [:12. VIDEOS ❑• 3. SAFE'L'Y MEETINGS [14, S'T'UDY GUIDES/MANUALS 11. <br /> E35. OTHER(Specify), r2. <br /> [16. NOT APPLICABLE SINCE FACILITY HAS NO EMPLOYEES <br /> ❑7. CHECK IF A SEPARATE EMPLOYEE TRAINING PLAN IS USED AND UPLOADED TO CERS AS A PDP DOCUMENT 13. <br /> ❑• 8, CHECK IF EMPLOYEE TRAINING IS COVERED BY THE ABOVE REFERENCED CONTENT AND OTHER DOCUMENTS ONSITE 14. <br /> FIVRILOYEF TRAINING FREQUENCY AND RECORDKEEPING TRAINING MUST BE: <br /> • Provided initially for new employees as soon as possible following the date of hire. New employees should not work in air unsupervised position that involves <br /> hazardous materials handling and/or hazardous waste management without proper training; <br /> • Provided widrin six months from the date of hire for new employees at a large qumrtfty generator; <br /> • Ongoing and provided at least annually; <br /> • Amended prior to a change in process or work assignment; <br /> • Given upon modification to the Emergency Response/Contingency Plan. <br /> Large Quantity Generator Training;Large quantity generators(1,000 kg or more)must retain written plan and documentation of employeo training which includes: <br /> •A written description of the type aid amount of both initial and ongoing training that will be given to persons filling cachjob position having responsibility for hazardous <br /> waste management and/or emergency response <br /> • The name,job title and job description for each poshioa at the facility related to hazardous waste management. <br /> • Current employee training records must be retained until elosuro orthe facility and former employee training records must be retained for at least three years after <br /> termination of employment. <br /> Small Quantity Generator Training: Small quantity generators (less than 1,000 kg) must include basic hazardous waste management and emergency response <br /> procedures but a written employee training plan and training records are not required. In order to show that the facility has met the small quantity generator employee <br /> training requirement,an employee training plan and training records may be made available. <br /> Hazardous Materials Business Pbua Training:Businesses must provide initial and around employee training that includes the content referenced above. The training <br /> may be based on the job position and training records must be made available for a period of at least three years, <br /> J. LIST OF ATTACHMENTS <br /> Check one of the following: TI <br /> (] I, NO ATTACHMENTS ARE REQUIRED;or <br /> ❑2. THE FOLLOWING DOCUMENTS ARE ATTACHED: r2. <br /> Rev,03/07/17 Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.