Laserfiche WebLink
CERS Consolidated.Emergency Response/Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY(Check all that apply)' cit <br /> ❑' L VERBAL WARNINGS; ❑' 2.PUBLIC ADDRESS OR INTERCOM SYSTEM; ❑3,TELEPHONE; <br /> J 4,PAGERS; ❑S.ALARM SYSTEM; E 6,PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY(Check all that apply): C12. <br /> J" 1.VERBAL WARNINGS; ❑2.PUBLIC ADDRESS OR INTERCOM SYSTEM; d 3.TELEPHONE; <br /> ❑4,PAGERS; ❑5,ALARM SYSTEM; ❑6.PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION: cu <br /> PRIMARY EMERGENCY COORDINATOR NAME: Roy Fetherolf PHONE NO.: (209)275-5227 PHONE NO,: <br /> ALTERNATE EMERGENCY COORDINATOR NAME, Thomas Espinoza PHONE NO.: (209)430-4996 PHONE NO.: <br /> ❑Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO.: <br /> Nate:If more than one alternate emergency coordinator is designated,attach a list in order of responsibility, <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility's procedures for containing spills and preventing and mitigating releases fires and/or explosions, <br /> 21, MONITOR FOR LEAKS,RUPTURES,PRESSURE BUILD-UP,ETC,; DI. <br /> ❑2. PROVIDE STRUCTURAL PHYSICAL BARRIERS(e,g.,Portable spill containment walls,built-in berms); <br /> ❑3. PROVIDE ABSORBENT PHYSICAL BARRIERS(e,g,Pads,spill pigs,spill pillows); <br /> [14. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> [15. LINED TRENCH DRAINS AND/OR SUMPS; <br /> 0 6. AUTOMATIC FIRE SUPPRESSION SYSTEM; <br /> ❑7. ELIMINATE SOURCES OF IGNITION FOR 17LAMNIABLE HAZARDS; <br /> 28, STOP PROCESSES AND/OR OPERATIONS; <br /> J 9, AUTOMATIC/ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> ❑ 10,SHUT OFF WATER,GAS,ELECTRICAL UTILITIES; <br /> EE 11,CALL 9-1-1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> E 12.NOTIFY AND EVACUATE PERSONS IN ALL THREATENED ANA/OR IMPACTED AREAS; <br /> Q 13.ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTEREVACUATION; <br /> [114.PROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> ❑ 15.REMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> ❑' 16.HIRE LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> ❑ 17.USE ABSORBENT MA'T'ERIAL FOR SPILL CONTAINMENT; <br /> ❑ 18.VACUUM SUCTION USING APPROPRIATE.VACUUM(e.g,Intrinsically safe)FOR SPILL CONTROL AND/OR CLEANUP; <br /> ❑19.DECONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> ❑20.PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑21,OTHER(Specify): D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S)WILL BE USED TO BEGIN EVACUATION Or THE FACILITY(Check all that apply)', Hi <br /> ❑ 1. BELLS; Ez. <br /> ❑2, HORNS/SIRENS; <br /> n3 VERBAL(i.e„Slroutiug); <br /> C7 4. OTHER(S eci : Public Address System <br /> THE FOLLOWING LOCATION(S)WILL BE USED FOR AN EMERGENCY ASSEMBLY AREA(S)(e,g.,Parking lot,street corner): In. <br /> Softball Fields and Parking Lot <br /> Note:The Emergency Coordinator must account For all onsite employe"and visitors after evacuation, _ <br /> EVACUATION ROUTE S AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS: Ea. <br /> 711.WRITTEN PROCEDURES DESCRIBING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑2,EVACUATION MAP(S)DEPICTING ROUTES,EXITS,AND ASSEMBLY AREAS; <br /> ❑3. OTHER(Specify): as. <br /> Noto:Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan. <br /> F, ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVANCE ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES(Check one of the following): ni. <br /> PI HAVE BEEN DETBRtMINED NOT NECESSARY; <br /> [-12. THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE(Specify): P2 <br /> Note:Advance arrangements with local fire and police departments,hospitals,state and local emergency response teams,and/or emergency services <br /> contractors should be made rnr your facility,if accessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev.03/07/17 Page 2 of 4 <br />