Laserfiche WebLink
SAN ,10AQUIN nvironmental Health Department <br /> Program Record Daily Time and Activity Summary from4/13/2001 to <br /> 8/13/2018 for PR0541222 located at <br /> Global Materials Management, LLC <br /> 1640 N Broadway Ave, Stockton <br /> Activity Date Recorded by <br /> 01/02/2018 Jay called this morning to let me know his truck is not fixed yet. He said the shop PE 2229 HENRY <br /> 18 min in Bakersfield said it would be ready at 4. He is going to pick up and come to SC 052 <br /> Stockton to remove the 5 bins of scrap metal. He said he would call me this <br /> afternoon. I told him I am out in the field tomorrow and am available on Thursday. <br /> After that I will be out of the office until January 16, 2018 and unavailable to do <br /> inspection. He said ok. <br /> 01/04/2018 Had not heard from Jay. I called him this afternoon. He said he finally got his PE 2229 HENRY <br /> 18 min truck fixed and he is loading up the scrap metal. I reminded him I would be out of SC 052 <br /> the office until the 16th-I had not heard from him on the 2nd or the 3rd as he had <br /> said he would call. Arranged for an inspection on the 16th at 9:00am. Requested <br /> for Jay to call and confirm that morning prior to inspection based on past history. <br /> He said he would. <br /> 01/16/2018 Received phone call from Jay canceling our inspection today. he explained PE 2229 HENRY <br /> 30 min everything has been removed from the property but he has not had time to get all SC 052 <br /> of the paperwork together. <br /> 01/18/2018 Closure inspection, sampling PE 2229 HENRY <br /> 120 min SC 052 <br /> 01/25/2018 Sample prep for GeoAnalytical PE 2229 HENRY <br /> 60 min SC 052 <br /> 03/02/2018 Discussed analysis with Justin Knorr and Dylan Clark DTSC. Per Dylan he would PE 2229 HENRY <br /> 60 min have them clean-up to visual contamination gone or go into oversight program. I SC 052 <br /> asked if he thought DTSC would wantto oversee. he said if we had a program it <br /> would be quicker for property owner. Said ok. <br /> 03/05/2018 Received emails from Jay with attached manifests. Called Jay and asked for PE 2229 HENRY <br /> 60 min TSDF copies of manifests. He said he would get them for me. Explained I am still SC 052 <br /> waiting for final result from the lab but further clean-up will be required at the site. <br /> I told him I would get back to him when I have heard from the lab. <br /> Called GeoAnalytical. Per Mario I should have TCLP results by Wednesday, <br /> 3/7/18. <br /> 03/09/2018 Did not receive lab results from GeoAnalytical yet(was supposed to receive 3/7). PE 2229 HENRY <br /> 30 min Sent email and called them. SC 002 <br /> 03/12/2018 Jeff Wong discussing location of septic tank, leach lines, contamination remains PE 2229 HENRY <br /> 60 min from sampling land use issues for this property. Jeff sent me LU site plans SC 002 <br /> showing proposed location for septic. It looks like where the intend to install new <br /> septic is where heaviest contamination remains. <br /> 03/13/2018 Received lab analysis indicated ND for Lead and Chrome for TCLP. Filed. PE 2229 HENRY <br /> 30 min SC 052 <br /> 03/20/2018 Notice to abate, samples, to property owner. PE 2229 HENRY <br /> 120 min SC 052 <br /> 03/21/2018 PE 2229 HENRY <br /> 120 min SC 052 <br /> 04/03/2018 Sent copies of OIR to ELaine at DAs office PE 2229 HENRY <br /> 12 min SC 052 <br /> Page 4 of 4 <br />