Laserfiche WebLink
Advanced GeoEnvironmental, Inc <br /> Site Health and Safety Plan <br /> Page 4 of 7 <br /> 6.0. ON-SITE WORK PLANS <br /> Work party(ies) consisting of two persons will perform the following tasks <br /> Project Team Leader: Task- <br /> William Little Collect and preserve samples <br /> Work Party 41: Task: <br /> Geoprobe Operator Advance probings <br /> Technician (if nec ) Collect samples, clean equipment <br /> iThe works party(ies)were briefed on the content of this plan at the site on <br /> 7 0. COMMUNICATION PROCEDURES <br /> If hearing is impaired, the following standard hand signals will be used <br /> Hand gripping throat Out of air, can not breath <br /> Grip partner's wrist or both hands around waist Leave area immediately <br /> Hands on top of head Need assistance <br /> Thumbs up OK, I am ainght, I understand <br /> Thumbs down No, negative <br /> AGE NC SHSPlverl 0l7anr3 96 <br />