Laserfiche WebLink
B-22-1998 1 : 14PM FROM PACIFIC SACRAMENTO 916 858 2355 ' P- 4 <br /> June 10, 1998 <br /> Page 4 <br /> SCHEDULE <br /> PEG is prepared to initiate field work within two w k%following approval of this work <br /> plan by the SJCPHS-EHD and the securing of permits. A report documenting the. <br /> findings of the investigation is anticipated to be subiffitted approximately 10 to 12 weeks <br /> after the campletion of field work. <br /> If there are any,questions regarding the contents of this work plan,please call us at . <br /> (915)858-2350. <br /> sincerely, <br /> Pacific Environmental Group,Inc. _ <br /> Michael E.Mitchener ,►tip QFO�. <br /> Project Geologist k w <br /> Cc <br /> Christine W. Brown �7 <br /> Senior Geologist mr�� of A�►� <br /> RG 4556 <br /> Attachments: Figure 1 -Site Location Map " <br /> Figure 2.-Site Map <br /> Attachment A-SJCPHS-EHD Letter Dated April 16, 1998 <br /> Attachment B -Field and Laboratory Prdcedures <br /> 4 <br /> cc: Mr. Michael J.Infuma.Jr., San Joaquin County Public Health Services-EHD <br /> Mr. Mark List,Regional Water Quality Control Board <br /> i <br /> s <br /> c <br /> 911-007.1 B/W RKPLN <br />