Laserfiche WebLink
June 10, 1998 <br /> Page 4 Y <br /> SCHEDULE <br /> PEG is prepared to initiate field work within two veeks following approval of this work <br /> plan by the SJCPHS-EHD and the securing of per its. A report documenting the <br /> findings of the investigation is anticipated to be st bmitted approximately 10 to 12 weeks <br /> after the completion of field work. - <br /> If there are any questions regarding the contents o this work plan, please call us at <br /> (916) 858-2350. , <br /> Sincerely, <br /> Pacific Environmental Group,Inc. _ <br /> Michael E. Mitchener �R D GE <br /> O�� <br /> Project Geologist E W. 9,qo 0 <br /> Christine W. Brown sT4 <br /> Senior Geologist TF 0 CA4�F� <br /> RG 4556 <br /> Attachments: Figure 1 - Site Location Map <br /> Figure 2 - Site Map <br /> Attachment A - SJCPHS-EHD Letter Dated April 16, 1998 <br /> Attachment B -Field and Laboratory Prdcedures <br /> cc: Mr. Michael J. Infurna Jr., San Joaquin Count y Public Health Services-EHD <br /> Mr. Mark List, Regional Water Quality Control Board <br /> 91 1-007.1 B/w RKPLN <br />