My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1700
>
2900 - Site Mitigation Program
>
PR0507794
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 12:39:27 PM
Creation date
7/27/2020 10:15:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507794
PE
2950
FACILITY_ID
FA0007765
FACILITY_NAME
TOSCO MARKETING CO (UNOCAL/TOSCO)
STREET_NUMBER
1700
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22802002
CURRENT_STATUS
02
SITE_LOCATION
1700 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 5.0 EXPOSURE MONITORING PLAN <br /> A. General <br /> An air quality monitoring program shall be implemented to provide baseline and on-going air <br /> quality data for site operations. This program shall include an on-going evaluation of on-site <br /> atmospheric contaminant concentrations during work site activities that involve significant <br /> surface disturbances using organic vapor detection instruments and/or detector tubes. <br /> Additionally, the program may include a preliminary survey of existing air quality <br /> conditions, prior to any surface disturbances and, i possible, under anticipated "worst case" <br /> weather conditions, to be used to establish baseline levels for input into the respiratory <br /> protection selection process. The Project Safety Officer may also decide to perform <br /> perimeter monitoring of downwind air quality conditions during significant surface <br /> disturbances. <br /> B. Action Levels <br /> If it is determined based on PID readings that total iydrocarbon levels in the work area reach <br /> 10 ppm in the breathing zone for 5 minutes, ha if mask respirators with organic vapor <br /> cartridges will be required. <br /> If PID readings indicate total hydrocarbon levels reach 25 ppm in the breathing zone for <br /> 5 minutes, work activities will be suspended until the airborne hydrocarbon concentrations <br /> decrease to less than 10 ppm. 1f airborne levels remain at 25 ppm or more, all work will <br /> cease until all personnel working in the exclusion zone are equipped with full face or if <br /> necessary supplied air respiratory protection including pressure demand air supplied <br /> respirators or self contained breathing apparatus (S BA). <br /> 6.0 PERSONAL PROTECTIVE EQUIPMENT <br /> I <br /> A. Introduction <br /> It is important that personal protective equipment and safety requirements be appropriate to <br /> protect against the potential hazards at the site. Protective equipment will be selected based <br /> 6 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.