My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1755
>
2900 - Site Mitigation Program
>
PR0507881
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 1:06:28 PM
Creation date
7/27/2020 10:43:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0507881
PE
2950
FACILITY_ID
FA0007817
FACILITY_NAME
CURT HUGHES DODGE
STREET_NUMBER
1755
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
20831015
CURRENT_STATUS
02
SITE_LOCATION
1755 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Avoid operating equipment durin electrical torms. <br /> P gg <br /> Drill Rig Hazards <br /> Safe work practices for drill rig operation include: i <br /> When moving a drill rig off-road, pay parti ular attention to obstacles in the route <br /> of travel. Walk the route first. <br /> Have an assistant guide the driver when in close proximity to hazards or if clearance <br /> is at a minimum. <br /> Set the brakes and/or block the wheels when Ihe mast is set up. <br /> The mast must be lowered when traveling off road. <br /> Be certain of the status of utilities (energized, charged, etc. in the area of the rig. <br /> ( g � g ) g <br /> Call Underground Service Alert (800-642-2 ) for assistance in locating utilities. <br /> Consider overhead lines to be energized. Watch for sagging lines when entering a <br /> site; call the utility for assistance in moving tf em. <br /> Do not operate the drill rig within 15 feet of overhead lines; check with local <br /> authorities to confirm the distance requirement. <br /> Make sure the site is clear of obstructions, debris, etc., prior to setting up the drill rig. <br /> Maintain proper "housekeeping" around and on the drill rig at all times. Tools should <br /> be stored in a manner that permits convenient access but also provides for personnel <br /> safety. <br /> 1y ` <br /> A-7 <br /> 1 . r <br />
The URL can be used to link to this page
Your browser does not support the video tag.