My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1160
>
2900 - Site Mitigation Program
>
PR0517411
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 2:07:35 PM
Creation date
7/27/2020 10:54:52 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0517411
PE
2950
FACILITY_ID
FA0013411
FACILITY_NAME
PAYLESS SHOE STORE
STREET_NUMBER
1160
Direction
W
STREET_NAME
YOSEMITE
City
MANTECA
Zip
95337
APN
21902033
CURRENT_STATUS
01
SITE_LOCATION
1160 W YOSEMITE
P_LOCATION
04
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.I I <br /> 44p <br /> 1 B <br /> Shell Oil Sites <br /> Page 4 b <br /> 880 Victor Road,Lodi <br /> Due to the high concentration of tertiary butyl alcohol(IBA) Shell stated that a groundwater <br /> extraction system as interim remediation to remove the dissolved MTBE and TBA mass may be <br /> inappropriate since treatment by granulated.activatedcarbon (GAC) may be unable to separate the <br /> TBA compound from the extracted groundwater before discharge. <br /> f <br /> Shell agreed to set up a telephone conference between Shell representatives (including chemists and <br /> geologists in Westhollow),Cambria and EHD to discuss other technologies or treatment options <br /> that could remediate the TBA and MTBE mass. Please schedule this conference with EHD by July s' [ <br /> 11, 2005. <br /> } <br /> Shell agreed to review soil vapor extraction (SVE) as a potential remediation of the contamination in <br /> the vadose zone as previously directed in an EHD letter dated October 27,2004. A report of this <br /> review should be submitted to EHD by July 31,2005. r <br /> EHD agreed to provide requests in writing to Teresi Trucking and the San Joaquin County Mosquito <br /> Abatement District that they cooperate with Shell by providing the necessary access to their <br /> properties for installation of the monitoring wells..: <br /> :s <br /> Please understand that not performing active remediation at this site is not an option at this time. <br /> j f <br /> 4315 Waterloo Road Stockton <br /> Shell agreed to submit the over-excavation report and EHD requests the report be submitted by July <br /> 31,2005. Cambria will conduct the 2.a quarter sampling event during the third week of June. Shell 's <br /> will review the over-excavation soil sampling results and if additional monitoring wells or soil <br /> borings are required, an addendum to the work plan dated September 17,2004 will be submitted. If <br /> not,Cambria will implement the remaining portion of the already approved work plan. <br /> p <br /> (1160 Yosemite Avenue.Manteca i <br /> There are low concentrations (<3 ug/L)of 1,2-DCA in groundater samples from four of the five <br /> monitoring wells. EHD recommended that an SCM and a closure report(discussed in the Tri- <br /> Regional Board Staff Recommendations dated April 16,2004) lie prepared. <br /> If you have any questions or comments please contact the appropriate LOP staff overseeing the site <br /> or call me at (209) 468-3449. , <br /> Donna Heran,REHS,Director <br /> Environmental <br /> �Health <br /> �Department j <br /> v I <br /> i <br /> Margaret Lagorio,Supervising REHS <br /> Site Mitigation Unit <br /> c: CVRNVQCB—James L. L. Barton,RG <br /> Cambria—Joe Neely,Aubrey Cool <br /> ih <br />
The URL can be used to link to this page
Your browser does not support the video tag.