My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
853
>
2900 - Site Mitigation Program
>
PR0508124
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 1:40:48 PM
Creation date
7/27/2020 11:36:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0508124
PE
2950
FACILITY_ID
FA0007949
FACILITY_NAME
7 ELEVEN #21756
STREET_NUMBER
853
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22332015
CURRENT_STATUS
01
SITE_LOCATION
853 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
State Water Resources Control Board <br /> 'a <br /> Division of Financial Assistance <br /> 1001 I Street•Sacramento,California 95814 <br /> Lloyd, P.O.Box 944212•Sacramento,California•94244-2120 <br /> Alan C LPh.D. <br /> Agency Loyd, h (916)341-5761.FAX(916)341-5806+ www.waterboards.ca.govlcwphome/ustcf Arnold Schwarzenegger <br /> Governor <br /> January 23, 2006 ME <br /> 7-ELEVEN, INC. <br /> KEN HILLIARD At-.f 2 6 2006 <br /> P O BOX 711 <br /> DALLAS,TX 75221-0711 ENV1F1'1X1tiil1,ENT HEALTH <br /> PERMITiSFRVICES <br /> UNDERGROUND STORAGE TANK CLEANUP FUND (FUND),NOTICE OF ELIGIBILITY <br /> DETERMINATION: CLAIM NUMBER 018319; FOR SITE ADDRESS: 853 YOSEMITE AVE E, <br /> MANTECA <br /> Your claim has been accepted for placement on the Priority List in Priority Class "D"with a deductible <br /> of$10,000. <br /> We have completed our initial review. The next step in the claim review process is to conduct a <br /> compliance review. <br /> Compliance Review: Staff reviews,verifies, and processes claims based on the priority and rank within a <br /> priority class. After the Board adopts the Priority List,your claim will remain on the Priority List until <br /> your Priority Class and rank are reached. At that time, staff will conduct an extensive Compliance <br /> Review at the local regulatory agency or Regional Water Quality Control Board. During this Compliance <br /> Review, staff may request additional information needed to verify eligibility. Once the Compliance <br /> Review is completed, staff will determine if the claim is valid or must be rejected. If the claim is valid,a <br /> Letter of Commitment will be issued obligating funds toward the cleanup. If staff determine that you <br /> have not complied with regulations governing site cleanup,you have not supplied necessary information <br /> or documentation,or your claim application contains a material error, the claim will be rejected. In such <br /> event, you will be issued a Notice of Intended Removal from the Priority List,informed of the basis for <br /> the proposed removal of your claim, and provided an opportunity to correct the condition that is the basis <br /> for the proposed removal. Your claim will be barred from further participation in the Fund, if the claim <br /> application contains a material error resulting from fraud or misrepresentation. <br /> Record keeping: During your cleanup project you should keep complete and well organized records of all <br /> corrective action activity and payment transactions. If you are eventually issued a Letter of Commitment, <br /> you will.be required to submit: (1)copies of detailed invoices for all corrective action activity performed <br /> (including subcontractor invoices), (2) copies of canceled checks used to pay for work shown on the <br /> invoices, (3)copies of technical documents (bids,narrative work description,reports), and(4) evidence <br /> that the claimant paid for the work performed(not paid by another party). These documents are necessary <br /> for reimbursement and failure to submit them could impact the amount of reimbursement made by the <br /> Fund. It is not necessary to submit these documents at this time; however, they will definitely be <br /> required prior to reimbursement. <br /> Compliance with Corrective Action Requirements: In order to be reimbursed for your eligible costs of <br /> cleanup incurred after December 2, 1991,you must have complied with corrective action requirements of <br /> Article 11, Chapter 16, Division 3,Title 23, California Code of Regulations. Article 11 categorized the <br /> California Environmental Protection Agency <br /> 0 Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.