Laserfiche WebLink
IT Corporation <br /> C757 Arnold Drive, Suite D <br /> Martinez, CA 9¢553-6526 <br /> I Tel. 925.370-3990 <br /> ® Fax. 925.370.3991 <br /> tete <br /> VI*OUP. <br /> A hlemher olThe IT Group <br /> ENVIRONMENTAL HEALTH DIVISION <br /> 304''E. Weber Ave.Third Floor <br /> P O. Box 388, Stockton CA 95201-0388 <br /> March 23, 1999 Appr6ved <br /> Denied <br /> Mr, Harlin Knoll Conditions <br /> San Joaquin County Public Health Services <br /> Environmental Health Division Date ITI by <br /> 304 East Weber Avenue, Third Floor <br /> ' Stockton, CA 95202 <br /> .i <br /> RE: WORK PLAN FOR SUBSURFACE INVESTIGATION <br /> i SOUTHLAND STORE NO. 21756 j <br /> 853 EAST YOSEMITE AVENUE, MANTECA, CALIFORNIA <br /> j <br /> i <br /> Dear Mr. Knoll: <br /> ' •i <br /> IT Corporation proposes the following work plan to investigate soil �nd groundwater conditions at Southland <br /> Store No. 21756 (Figure 1), as requested by the San Joaquin County Environmental Health Division (SJCEHD) <br /> via verbal communication on March 18, 1999. The scope of work in6ludes 1)generating a site safety plan, 2) <br /> drilling five soil borings using a geoprobe, and 3) reporting our find`ngs. The scope of work is designed to <br /> address site conditions since the removal of three 10,000-gallon underground storage tanks (USTs) in f <br /> December of 1998, and to ascertain whether site closure is warranted,or further remedial steps are necessary. <br /> The proposed drilling locations are shown on Figure 2. Analytical data for soil samples collected during the <br /> UST removal are summarized in Table 1. <br /> l <br /> i r <br /> I <br /> SITE HEALTH AND SAFETY PLAN/PERMITTING s <br /> The Health and Safety plan has been prepared by IT Corporation as,Irequired by the Occupational Safety and <br /> Health Administration (OSHA) Standard"Hazardous Waste Operations and Emergency Response"guidelines <br /> (29 CFR 1910.120). The plan will be reviewed and signed by all IIT Corporation personnel/subcontractors <br /> performing work on the site. Prior to the start of work, permits for the soil borings will be obtained from the <br /> SJCEHD and Underground Service Alert(USA)will be contacted to get on-site underground utilities marked. i <br /> The SJCEHD will be notified two days prior to the start of work. i j <br /> I - <br /> � I <br /> I <br /> I <br /> I <br />