Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1) <br /> Type of Action ❑ Installation Test ❑ Repair Test E 12 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 10181019 11/01/2019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As.) <br /> Tracy Market <br /> Business Site Address City ZIP Code <br /> 15 E. Grant Line Rd. Tracy, CA 95376 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the ICC Certification.) Phone# <br /> Marco Alejos (888) 500 - 2435 Ext.2 <br /> ContractoriTank Tester License# ICC Certification# ICC Certification Expiration Date <br /> 958763 8415074 04/27/2021 <br /> Spill Container Testing Training and Certifications(List applicable certifications.) <br /> OPW Phase 1 EVR#0177295 exp. 03/04/2021 <br /> III. SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used: <br /> ❑ Manufacturer Guidelines:(Specify) <br /> E Industry Code or Engineering Standard: (Specify) Hydrostatic One Hour Lake Test <br /> ❑ Engineered Method: (Specify) <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> Tank ID:(By tank number,stored product,etc.) Regular Regular Syphon Super <br /> Spill Container Manufacturer: OPW OPW OPW <br /> E Non-Metallic E Non-Metallic E Non-Metallic <br /> Method of Cathodic Protection ❑ Isolation ❑ Isolation ❑ Isolation <br /> ❑Other ❑Other ❑ Other <br /> (Specify in section V.) (Specify in section V.) (Specify in section V.) <br /> Inside Diameter of Spill Container:(Inches) 12 12 12 <br /> Depth of Spill Container:(Inches) 14 14 14 <br /> Does the spill container have a 5 gallon capacity? E Yes ❑ No E Yes ❑ No E Yes ❑ No <br /> E Drain Valve E Drain Valve E Drain Valve <br /> Method to Keep Spill Container Empty ❑Onsite Pump ❑Onsite Pump ❑Onsite Pump <br /> ❑Other ❑ Other ❑Other <br /> (Specify in section V) (Specify in section V.) (Specify in section V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results E Pass ❑ Fail 1 E Pass ❑ Fail E Pass ❑ Fail <br /> V. COMMENTS <br /> All items marked"Fail"above must be explained in this section.Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> I hereby certify that the spill containers were tested in accordance with California Code of Regulations,title 23,division 3,chapter 16,section <br /> 2637.1 and all the information contained her i ccurate. <br /> UST Service Technician Signature <br /> If the facility has more components than thWYVfffFa6dommodates,additional copies of this page maybe attached. <br /> CERS=California Environmental Reporting System,ID=Identification,UST=Underground storage tank,ICC=International Code Council <br />