My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006765
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
853
>
2900 - Site Mitigation Program
>
PR0508124
>
ARCHIVED REPORTS_XR0006765
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 3:17:55 PM
Creation date
7/27/2020 2:20:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006765
RECORD_ID
PR0508124
PE
2950
FACILITY_ID
FA0007949
FACILITY_NAME
7 ELEVEN #21756
STREET_NUMBER
853
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
22332015
CURRENT_STATUS
01
SITE_LOCATION
853 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Oxygen Release Compound, ORC® <br /> Cost Comparison <br />'f� • Mechanical Treatment Methods <br /> Assumptions: <br /> 10 ppm dissolved phase BTEX Plume width of 80 ft with seepage velocity of 3 ft/day <br /> 8 feet to groundwater and 12 foot contaminated saturated zone No floating product <br /> Oxygen Carbon Ratio = 3 1 <br /> The site is assumed to be developed with roads, sewers, and already installed 220 volt/3 phase power available at no <br /> additional cost for installations, permits,electncal distribution,or equipment(for those treatment methods requiring sewer <br /> or electricity) In addition, it is assumed that no buildings or general area fencing are required,but above-ground process <br /> equipment is fenced <br /> Special testing necessitated by the nature of the treatment and routine BTEX analysis are included Additional standard <br /> monitoring costs for the site are excluded,since they are assumed to be site specific and determined by local regulatory <br /> agencies (Note that no testing of off gases from air sparging is provided in the estimates) <br /> ORC Oxygen Barrier First Year Subsequent Years <br /> Installation 545,000 so <br /> Annual Operating Cost 24,000 18,000 <br /> Total $69,000 =SI810001 <br /> Pump-and-Treat <br /> Installation $132,000 SO <br /> Annual Operating Cost 94.000 36.000 <br /> Total S226,000 536,000 <br /> Arr.Spargmg Bamcr wtlh SVE <br /> Installation 5127,000* $0 <br /> Annual Operating Cost 529,000 $29,000 <br /> Total $156,000 529,000 <br /> Air-Spargrng Barrer wtthoza SVE(If pernusstble) <br /> Installation $61,000* SO <br /> Annual Operating Cost 14,000- 14,000 <br /> Total 575,000 S14,000 <br /> *Plus cost of pilot test,if necessary Experts often advise against implementing an air sparging treatment without a field <br /> pilot test which typically costs$10,000 to 1;30,000 Many reputable consulting firms refuse to install air spargmg systems <br /> without pilot testing due to the importance of site-to-site variability m system performance,and third party liability concerns <br /> REGENESIS ---------------------------------------------------------------------------------------------- <br /> loremediation Products 27130A Paseo Espada, Ste 1407, San Juan Capistrano, CA 92675 <br /> Phone 714-443-3136 Fax 714-443-3140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.