Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Test ❑ Repair Test Z 12 Month Test <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 1 /28/ 19 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> BEN HOLT ARCO <br /> Business Site Address City ZIP Code <br /> 2908 BEN HOLT DR STOCKTON , CA 95204 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification) Phone # <br /> EDWARD STEARNS 1 (209 ) 744 -0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 14- 1760 Ex . 9/30/20 8883080- UT 11 /9/2020 <br /> Spill Container Testing Training and Certifications (List applicable certifications.) <br /> Franklin Fueling - EBW & Phil Tite # 1009893708 Ex . 11 /29/2020 <br /> OPW # 104-635 Ex . 3/ 14/2020 <br /> III . SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used : x❑ Manufacturer Guidelines (Specify) : LAKE TEST <br /> ❑ Industry Code or Engineering Standard (Specify). <br /> ❑ Engineered Method (Specify): / 14F ) <br /> ENW11NXk <br /> p <br /> Attach the testing procedures and all documentation required to determine the results. Attached fgt''s <br /> TANK ID : (By tank number, stored product, etc.) 87- 1 87-2 91 <br /> Spill Container Manufacturer: OPW OPW OPW <br /> Method of Cathodic Protection : ❑x Non-Metallic ❑x Non-Metallic 0 Non-Metallic ❑ Non-Metallic <br /> ❑ Isolation ❑ Isolation ❑ Isolation ❑ Isolation <br /> ❑ Other (Specify in V) ❑ Other (Specify in V.) ❑ Other (Specify in V.) ❑ Other (Specify in V) <br /> Inside Diameter of Spill Container: (Inches) 11 11 11 <br /> Depth of Spill Container: (Inches) 15 14 14 <br /> Does the spill container have a 5 gallon capacity? 0 Yes ❑ No ❑x Yes ❑ No 0 Yes ❑ No ❑ Yes ❑ No <br /> Method to Keep Spill Container Empty: ❑x Drain Valve ❑x Drain Valve Z Drain Valve ❑ Drain Valve <br /> ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump ❑ Onsite Pump <br /> ❑ Other (Specify in V) ❑ Other (Specifyin V) ❑ Other (Specify in V) ❑ Other (Specify in V.) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results : N Pass ElFail ZPass ❑ Fail ❑x Pass E] Fail [j Pass E] Fail <br /> V. COMMENTS <br /> Any items marked "Fail" above must be explained in this section. Any additional comments may also be provided here . <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> hereby certify that the spill containers were tested in accordance with California Code of Regulations , Title 23 , Division 3, <br /> Chapter 16 , Section 2637. 1 and all the information contained herein is accurate. <br /> UST Service Technician Signature s <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council <br />