Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> OVERFILL PREVENTION EQUIPMENT INSPECTION REPORT FORM (Page 1 of 1 ) <br /> Type of Action ❑ Installation Inspection ❑ Repair Inspection 0 36 Month Inspection <br /> I . FACILITY INFORMATION <br /> CERS ID Date of Overfill Prevention Equipment Inspection <br /> 10181441 10/3/2018 <br /> Business Name (Same as Facility Name or DBA-Doing Business As) <br /> RIVER POINT LANDING <br /> Business Site Address City ZIP Code <br /> 4950 BUCKLEY COVE WAY STOCKTON , CA 95267 <br /> II . UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Inspection (Print as shown on the ICC Certification.) Phone # <br /> DAVID WINKLER (209 ) 744-0112 <br /> Contractor / Tank Tester License # ICC Certification # ICC Certification Expiration Date <br /> 08- 1739 Ex . 3/31 /2020 8883059- UT 1 /29/2020 <br /> Overfill Prevention Equipment Inspection Training and Certifications (List applicable certifications.) <br /> FF- EBW , Phil-Tite & EVR Phase 1 1009853708 Ex 11 - 16- 18 OPW 104-633 Ex 3- 14-2020 <br /> Emco Ex. 10- 1 -20 VR : B34975 ATG : 2/8/20 <br /> III . OVERFILL PREVENTION EQUIPMENT INSPECTION INFORMATION <br /> Inspection Method ❑x Manufacturer Guidelines (Specify) : <br /> Used : REMOVED DROP TUBE <br /> ❑ Industry Code or Engineering Standard (Specify) : <br /> ❑ Engineered Method (Specify) : <br /> Attach the inspection procedures and all documentation required to determine the results. # of Attached Pages 4 <br /> TANK ID : (By tank number, storedproduct, etc.) 87 DIESEL <br /> What is the tank inside diameter? (Inches) 96 96 <br /> Is the fill piping secondarily contained ? ❑ Yes ❑x No ❑ Yes ❑x No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Is the vent piping secondarily contained? ❑ Yes 0 No ❑ Yes Z No ❑ Yes ❑ No ❑ Yes ❑ No <br /> Overfill Prevention Equipment Manufacturer(s) OPw oPw <br /> 6150 7150 <br /> What is the overfill prevention equipment response ❑x Shuts Off Flow 0 Shuts Off Flow ❑ Shuts Off Flow ❑ Shuts Off Flow <br /> when activated ? <br /> (Check all that apply.) ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow ❑ Restricts Flow <br /> ❑ A/V Alarm ❑ A/V Alarm ❑ A/V Alarm ❑ AN Alarm <br /> Are flow restrictors installed on vent piping ? ❑ Yes [E No ❑ Yes ❑X No ❑ Yes ❑ No ❑ Yes ❑ No <br /> At what level in the tank is the overfill prevention set <br /> to activate? (Inches from bottom of tank.) 851 /2 85 . 6 <br /> What is the percent capacity of the tank at which the <br /> overfill prevention equipment activates? 94 % 94 % <br /> Is the overfill prevention in proper operating condition ❑x Yes 0 Yes ❑ Yes ❑ Yes <br /> to respond when the substance reaches the <br /> appropriate level ? ❑ No (Specify in V.) ❑ No (Specify in V.) ❑ No (Specify in V) ❑ No (Specify in V.) <br /> IV. SUMMARY OF INSPECTION RESULTS <br /> Overfill Prevention Inspection Results 0 Pass ❑ Fail ❑x Pass ❑ Fail [:] Pass ❑ Fail ❑ Pass ❑ Fail <br /> V. COMMENTS <br /> Any items marked "Fail" must be explained in this section. Any additional comments may also be provided here. <br /> �,4AY 17 2019 <br /> VI . CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCT T H IS 11 <br /> SPEC TION <br /> I hereby certify that the overfill prevention equipmentwas inspected in accordance with California Code of Regulations , Title 23 , <br /> Division 3 , Chapter 16 , Section 2637. 2 and all the information contained herein is accurate. <br /> UST Service Technician Signature V <br /> If the facility has more components than this form accommodates, additional copies of this page may be attached. <br /> CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Council, A/V = Audible and Usual <br />