Laserfiche WebLink
Q3/16/2001 11: 33 211167 AGE STOCKTON • PAGE 11 <br /> 12 March 2001 <br /> AGE-NC Project No. 97-0333 <br /> Page 8 of 9 <br /> 3.5. PURGED WATER DISPOSAL <br /> Purged ground water will be containerized in an on-site 6,500-gallon Baker tank; following the 12- <br /> hour aquifer pump test, a composite"grab"ground water sample will be collected from the Baker <br /> tank to analyze for TPH-g,BTEX,MTBE,TBA,TAME,DIPE, ETBE,ED) and 1,2-ACA by EPA <br /> Methods 8015M, 8020 and 8260M.The purged ground water will be transported off-site under non- <br /> hazardous waste manifest to Invirotech, a waste treatment facility located in Roseville,California. <br /> Advamud GmEnvironmental,Inc. <br />