My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
420
>
2900 - Site Mitigation Program
>
PR0537485
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/27/2020 3:42:55 PM
Creation date
7/27/2020 2:46:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0537485
PE
2957
FACILITY_ID
FA0021568
FACILITY_NAME
FORMER RAINWATER CAR WASH
STREET_NUMBER
420
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
21931206
CURRENT_STATUS
01
SITE_LOCATION
420 W YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> ' Community Health and Safety Plan <br /> RAINWATER CAR WASH,Manteca,California 95336 Page 13 <br /> May 30,1011 <br /> ' 5.5.10 Materials and Equipment Handling <br /> The movement and handling of equipment and materials on the site can pose a risk to workers in the form of <br /> ' muscle strains and minor injuries.These injuries can be avoided by using safe handling practices,proper lifting <br /> techniques,and proper personal safety equipment such as steel-toed boots and sturdy work gloves. Where <br /> practical,mechanical devices will be used to assist in the movement of equipment and materials,workers will not <br /> ' attempt to move heavy objects by themselves without using appropriate mechanical aids such as drum dollies or <br /> hydraulic lift gates. <br /> 5.5.11 Housekeeping and Sanitation <br /> ' In order to promote safe and efficient work conditions,all work areas will be kept clean and free of debris.All <br /> hand tools will be kept out of the immediate work area until they are needed for use.Potable water will be made <br /> ' available for first aid,drinking,and personal hygiene purposes. <br /> 5.5.12 Traffic Safety <br /> Vehicle traffic that is unrelated to site activities may be present,particularly when work occurs on streets and <br /> highways. When work occurs in an area open to vehicular traffic,the work area will be clearly delineated by use <br /> of cones,signs and other appropriate warning devices to restrict vehicular access.Personnel exposed to vehicular <br /> traffic will use high-visibility clothing(e.g.,bright orange vest)in accordance with the requirements of 8 CCR <br /> 1598(c). If necessary,the SHSS will require the use of a flagger or other appropriate traffic control measures. <br /> 5.5.13 Safety Equipment Failure <br /> If monitoring instruments or any safety equipment fails,work will be suspended until repairs or replacements for <br /> that equipment can be found. In case of working equipment failure,field safety personnel will ensure that <br /> ' hazardous conditions have been abated before authorizing further work. <br /> 5.5.14 Drilling <br /> ' Operation of drilling and sampling equipment during site activities presents potential physical hazards to <br /> personnel.During all site activities,PPE such as steel-toed shoes, safety glasses or goggles,and hardhats should <br /> be worn whenever such equipment is present. Personnel should be aware of the location and operation of drilling <br /> and sampling equipment at all times and take precautions to avoid obstructing operation of the equipment. <br /> During setup of the drilling rig,overhead power lines pose a danger of shock or electrocution if the power line is <br /> contacted or severed during site operations. Before work is conducted in areas where overhead lines could be <br /> encountered,the appropriate utility company will be notified,and information will be obtained regarding the <br /> minimum separation distance required for work in this area.A minimum separation distance of 10 feet will be <br /> ' maintained at all times. Use of a spotter is required,at a minimum,to maintain proper clearance. <br /> Water exposure to construction activities is a potential hazard. Heavy machinery,moving traffic and foot traffic <br /> ' must be watched out for.Workers on-site must wear hardhats and steel-toed boots.Barricades and caution tape <br /> will surround the construction.Adequate areas will be marked for traffic. <br /> ' Ami Adini <br /> &Associa4es.hic. <br />
The URL can be used to link to this page
Your browser does not support the video tag.