Laserfiche WebLink
SAN JOAQUIN Environmental Health Department <br /> 2' <br /> COUNTY Linda Turkatte , REHS , Director <br /> °gtiFOR�`P Greatness grows here . Kasey Foley, REHS , Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS , RDI <br /> Rodney Estrada , REHS <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> August 23 , 2019 <br /> Terry Masters <br /> Elite IV Contractors <br /> 2635 Wigwam Dr , <br /> Stockton , CA 95205 <br /> Re : St . Joseph ' s Hospital SR0081015 <br /> 1800 N . California St . , Stockton , CA 95204 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the <br /> application for a permit to replace the direct- bury diesel spill container and diesel drop tube on the <br /> underground storage tank ( UST) system at the above noted address . The permit has been approved <br /> with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for <br /> any applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work . All new addenda supersede the previous ones . <br /> 3 . Contact Stacy Rivera at (209 ) 468-3440 to arrange the following inspection appointments ( a <br /> 48 - hour notice is required for inspection appointments) . Please be aware that inspections for <br /> emergency work must be scheduled within five days of permit approval . <br /> a . Corrosion protection : Verify corrosion protection for direct bury spill bucket prior to <br /> backfilling . <br /> b . Spill bucket test : Verify minimum 5 -gallon capacity and pass a one hour hydrostatic test ( or <br /> equivalent) . Proper drainage must also be verified . <br /> c . Overfill prevention verification : Measurement of drop tubes to verify 95 % tank volume shut <br /> off. Verification of flapper functionality . Ensure that all pertinent tank charts and <br /> calculations are available for review at the time of inspection . <br /> d . Verification that ball float ( s ) , if installed , do not interfere with the installed flapper valve . <br /> e . Since concrete will be broken near the diesel tank , a secondary containment test must be <br /> performed on the diesel tank once concrete is poured in accordance with the <br /> manufacturer' s guidelines . <br /> Please be aware that the facility cannot receive fuel in the diesel tank prior to the EHD <br /> N <br /> nspection and approval . <br /> 4 . Any individual performing the work of a service technician must meet the following <br /> qualifications : <br /> a . Possess or be employed by a person who possesses one of several permissible valid , <br /> current contractor' s licenses issued by the Contractors State License Board ( may be issued <br /> to the installation company) , or a Tank Tester' s license issued to the individual by the State <br /> Water Board , and <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 T 209 468 -3420 1 F 209 464-0138 1 www . sjcehd . com <br />